Every page and article on the Al Mustafa Contracting website in one place: our services, project designs, permits and approvals guides, construction calculators, articles and the free app.
Main pages7 links
Services18 links
- Services
- What we build
- Villa construction company in Dubai
- Building construction company in Dubai: low-rise residential buildings
- Annex construction contractor in Dubai
- Annex design in Dubai
- Villa design service in Dubai
- Licensing unpermitted building works in Dubai
- Service guides
- Architectural Engineering Design Service
- Best way to build a villa extension, Majlis in the UAE 2026
- Design and implementation of a heritage rest house in the UAE
- Marble Chips Cladding – Best Price in UAE
- Areas we work in
- Annex and majlis projects in Al Barsha, Dubai
- Annex and majlis projects in Al Khawaneej, Dubai
- Annex and majlis projects in Al Mizhar, Dubai
- Annex and majlis projects in Nad Al Hamar, Dubai
- Annex and majlis projects in Al Qusais, Dubai
- Annex and majlis projects in Al Twar, Dubai
- Request a quote
Construction calculators27 links
- Construction Calculators (Quantities) – Dubai & UAE
- Structure and concrete
- Concrete Calculator (m3) with Ready-Mix Trucks
- Concrete Mix Ratio Calculator (Cement, Sand, Aggregate)
- Steel Weight Calculator (Rebar) and Bar Bending Schedule
- Rebar Cutting Optimizer (Steel Bar Cutting Plan)
- Rebar Equivalent Calculator (Bar Area Conversion)
- Slab Calculator (Concrete, Steel, Formwork and Hourdi)
- Masonry and finishes
- Block Calculator (Concrete Blocks)
- Block Wall Calculator (Blocks, Cement, Sand, Plaster, Paint)
- Plaster Calculator
- Cement and Sand Calculator: Screed and Mortar
- Paint Calculator
- Tile Calculator
- Room Tile and Paint Calculator (Finishing Quantities)
- Gypsum Board Calculator (Ceilings and Partitions)
- Waterproofing Calculator: Rolls, Primer and Screed
- Earthworks and site
- Excavation and Backfill Calculator (m3 and Truck Loads)
- Formwork Calculator (Shuttering Area, Plywood and Props)
- Interlock Paving Calculator (Pavers, Sand, Kerbs)
- Electrical, cooling, energy and water
- Cable Size Calculator (Preliminary)
- Villa Electrical Load Calculator
- Solar Panel Calculator (Shams Dubai)
- AC Size Calculator (BTU and Tons)
- Water Tank Capacity Calculator
- Planning
- Area Calculator (Plot, Room, Built-Up)
- Stair Calculator (Risers, Treads, Concrete)
- Annex BOQ Quantity Estimate (Concrete, Steel, Blocks)
Permits and approvals34 links
- Building Permits and Approvals in Dubai for Villas
- Before design: the plot and which authority
- Affection plan Dubai and Makani number: Dubai Municipality GIS guide for plot owners
- Which authority issues the building permit for a villa in Dubai, and which NOCs you need
- Villa building requirements in Dubai: plot, setbacks, height and the Dubai Building Code
- Dubai land use plan and changing plot use: what villa owners need to know
- Dubai 2040 Urban Master Plan explained for villa owners
- Design and the building permit
- Engineering consultancy in Dubai: rules for consultants and what owners should check
- Dubai Building Code explained: what villa owners and annex builders need to know
- Green building regulations in Dubai: Al Sa’fat and thermal insulation for villas and annexes
- How to get a building permit in Dubai for a villa annex, majlis or extension
- Dubai Civil Defence approval for a villa, annex or majlis: when it applies and how it fits the permit
- Building on a villa roof in Dubai: Dubai Municipality rules
- Dubai Municipality BIM requirements: who must submit a BIM model and what it means for villas
- Before and during construction
- Demolition permit in Dubai for a villa, annex or majlis: who applies and what happens next
- Temporary Construction Power for a Villa Site in Dubai: Options with DEWA
- Construction site safety in Dubai: what villa owners should know
- Dubai Municipality approved contractors and materials: how to check
- Labour accommodation in Dubai: Dubai Municipality requirements for workers’ housing and construction sites
- Electricity, water and drainage connections
- Connecting Electricity to a Villa Annex or Service Block in Dubai: The DEWA Steps
- Increasing the Electrical Load for a Villa Extension: What DEWA Needs
- DEWA Meter Location for a Villa: Electricity Cabinet and Water Meter
- DEWA LV Inspection for a Villa or Annex: What Must Be Ready Before the Inspector Arrives
- DEWA Under Voltage Relay for Air Conditioners in a Villa Annex: What the Circular Requires
- Drainage and sewerage connection for a villa in Dubai: Dubai Municipality approval, septic tanks and rainwater
- Shams Dubai for Villa Owners: Rooftop Solar Connection Steps, Fees and Limits
- Home EV Charger for a Dubai Villa: What DEWA Requires for Private Chargers
- Completion and after handover
- Building completion certificate in Dubai and Dubai Municipality inspections
- Periodic Inspection of a Villa Electrical Installation in Dubai: Alterations, Labels and Upkeep After Handover
- Existing buildings and violations
- How to license an existing unlicensed annex or building in Dubai
- Building Violations in Dubai: Fines for Building Without a Permit and How to Regularise
- Housing grants, loans and refunds
- Building a home with MBRHE support: villa construction guide for beneficiaries
- Building an Annex or Majlis with MBRHE Support: A Practical Guide
- MBRHE Loan or Grant for an Annex: Funding Guide
- VAT refund for UAE nationals building new residences: new villa and later annexes
Projects69 links
- Our Projects and Designs
- Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²
- Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²
- Al Zubair heritage rest house, 3 bedrooms – Al Zubair, Sharjah — 220 m²
- Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²
- Majlis – Al Dhaid, Sharjah — 55 m²
- Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²
- Residential villa, 4 rooms (3 bedrooms + maid’s room) – Al Sarooj, Al Ain, Abu Dhabi — 235 m²
- Outdoor majlis – Al Juraina, Sharjah — 132 m²
- Rest house, 6 bedrooms — 652 m²
- Villa annex, 3 bedrooms – Al Khawaneej, Dubai — 195 m²
- Majlis – Al Dhahir, Al Ain, Abu Dhabi — 120 m²
- Rest house, 1 bedroom
- Villa facade restoration and service annex
- Majlis, 1 bedroom – Mirdif, Dubai
- Villa annex, 2 bedrooms — 131 m²
- Villa annex, 1 bedroom
- Annex with master bedroom and hall – Nad Al Hamar, Dubai — 63.5 m²
- Ready-made cafe – Al Barsha South, Dubai — 15 m²
- Villa extension, 3 bedrooms – Sharjah
- Design: majlis – Al Manara, Dubai — 50 m²
- Design: majlis – Al Twar, Dubai — 62 m²
- Design: majlis – Al Barsha South, Dubai — 41 m²
- Design: villa annex, 1 bedroom – Al Khawaneej, Dubai — 97 m²
- Design: modern majlis and dining room – Mirdif, Dubai — 50 m²
- Design: family rest house, 2 bedrooms – Al Dhaid, Sharjah — 172 m²
- Design: family majlis with outdoor seating – Al Rashidiya, Dubai — 60 m²
- Design: majlis – Jumeirah, Dubai — 45 m²
- Design: villa annex, 3 bedrooms – Jumeirah, Dubai
- Design: villa annex, 1 bedroom – Al Qusais, Dubai
- Design: villa annex, 2 bedrooms – Al Twar, Dubai — 104 m²
- Design: majlis – Nad Al Sheba, Dubai — 54 m²
- Design: majlis – Al Safa, Dubai — 45 m²
- Design: service annex, 5 bedrooms – Al Rowaiyah, Dubai — 80 m²
- Design: family glass majlis – Al Quoz, Dubai — 35 m²
- Design: majlis – Warsan, Dubai — 67.5 m²
- Design: majlis – Oud Al Muteena, Dubai — 58 m²
- Design: majlis – Al Twar, Dubai
- Design: villa annex, 1 bedroom – Sharjah — 108 m²
- Design: villa annex, 2 bedrooms – Umm Suqeim, Dubai
- Design: villa annex, 1 bedroom – Umm Al Sheif, Dubai — 85 m²
- Design: villa annex, 1 bedroom – Al Manara, Dubai — 91 m²
- Design: majlis – Al Qusais, Dubai — 60 m²
- Design: majlis – Al Warqaa, Dubai — 37 m²
- Design: villa annex, 1 bedroom – Al Rashidiya, Dubai
- Design: family rest house, 2 bedrooms – Al Warqaa, Dubai — 164 m²
- Design: modern rest house, 1 bedroom, with pool – Hatta, Dubai
- Design: family rest house with 3 bedrooms and hall – Oud Al Muteena, Dubai
- Design: majlis – Za’abeel, Dubai — 122 m²
- Design: majlis – Al Khawaneej, Dubai
- Design: majlis – Nad Al Hamar, Dubai — 35 m²
- Design: villa annex, 3 bedrooms – Al Safa, Dubai
- Design: villa annex, 2 bedrooms – Warsan, Dubai
- Design: majlis with bathroom, wash basins and prep kitchen – Al Rowaiyah, Dubai — 66 m²
- Design: family rest house with 4 bedrooms and majlis – Al Qusais, Dubai
- Design: majlis – Al Wasl, Dubai
- Design: event majlis – Sharjah
- Design: majlis – Umm Suqeim, Dubai — 80 m²
- Design: rest house, 2 bedrooms, with pool – Za’abeel, Dubai — 122 m²
- Design: majlis and gym room – Al Mizhar, Dubai — 107 m²
- Design: annex – Nad Al Hamar, Dubai
- Design: majlis – Al Awir, Dubai — 54 m²
- Design: villa annex, 2 bedrooms, with outdoor seating – Al Mizhar, Dubai — 112 m²
- Design: annex or rest house, 1 bedroom – Al Bada’a, Dubai — 95 m²
- Design: family rest house, 2 bedrooms – Abu Dhabi — 189 m²
- Design: family rest house, 2 bedrooms – Al Ain, Abu Dhabi
- Design: majlis – Al Bada’a, Dubai
- Design: majlis – Al Barsha, Dubai — 62 m²
- Design: majlis – Al Mamzar, Dubai — 63 m²
Articles17 links
- Building a G+4 or G+6 residential building in Dubai: requirements and steps8 November 2026
- 3D printed building in Dubai: Dubai Municipality requirements and approval route31 October 2026
- Build a villa in Dubai: the complete owner’s guide22 September 2026
- Annex contractor in Dubai: 12 points for a clear agreement before you sign15 September 2026
- Villa construction stages in Dubai and how long each takes8 September 2026
- Low-rise and mid-rise buildings in Dubai: G+1 to G+12 explained22 August 2026
- Villa construction cost in Dubai: what drives it and how to read a BOQ8 August 2026
- Shell and core or turnkey? Choosing a villa construction contract in Dubai22 July 2026
- External majlis design ideas for villas: layouts and materials15 July 2026
- Low-rise building construction cost in Dubai: cost drivers for G+1 to G+68 July 2026
- Villa design in Dubai: floor plans, modern villa ideas and what the code allows22 June 2026
- Prefab annex in Dubai: types, uses and what to check15 June 2026
- Villa finishing in Dubai: stages, materials and what to agree before you start8 June 2026
- Sandwich panel roof annex in Dubai: pros, cons and when it fits15 May 2026
- Annex building materials compared: block, sandwich panel or cement board15 April 2026
- How much does an annex cost in Dubai? Annex cost factors15 March 2026
- Welcome to the Al Mustafa Contracting blog6 April 2022