We are Al Mustafa Contracting (المصطفى للمقاولات والخدمات والأعمال الفنية), a Dubai contractor that builds villa annexes, majlis, rest houses and prefab buildings. We stay with the villa owner from the first site visit to handover: 2D and 3D design, follow-up on Dubai Municipality permits, and construction in stages with the required inspections at each stage. This page tells you who we are before you get in touch.
Who we are
The company's legal name is Mustafa & Ibrahim Technical Services LLC, based in Dubai, and it trades as Al Mustafa Contracting. We focus on small and mid-size villa projects: an extra annex for the family, an external majlis for guests, a rest house, or an extension that serves the home. Some of our clients are Mohammed bin Rashid Housing Establishment (MBRHE) beneficiaries and some build with their own funds. With all of them we try to be clear from day one about what suits the plot, what does not, and which stages the project will go through.
The best introduction we can give is our actual work, so we invite you to browse the projects gallery and judge the build and finishing quality yourself.
What we build
- Villa annexes: bedrooms, a living hall, a prep kitchen and bathrooms, from a one-bedroom annex to a three-bedroom annex with a family hall.
- Majlis: external majlis and majlis with a bathroom and prep kitchen. See external majlis design ideas if you are still deciding.
- Rest houses: heritage or modern rest houses, with outdoor seating and a pool if you want one.
- Prefab buildings: prefabricated buildings for small uses, including a prefab cafe in Al Barsha South. Details are in our guide to prefab annexes in Dubai.
- Renovation: villa facade restoration and service annexes.
- Design and permit follow-up: 2D and 3D designs in more than one style, including Emirati heritage and modern classic, and follow-up on Dubai Municipality permits. Drawings are prepared through a licensed engineering office or designer. See our services page.
If you already have an unlicensed annex, read our guide to licensing an existing annex in Dubai for the general steps.
How we work: from site visit to handover
Every project follows the same sequence, so no step catches you by surprise:
- Site visit and listening: we inspect the plot and the available area and understand the family's needs and the intended use, so the scope of work is clear from the start.
- Design and 3D views: you review the plan and see the expected result before construction begins.
- Permits and approvals: we follow up with you on what the relevant authorities require for your project. Requirements differ from case to case, and the authority confirms them for each project.
- Construction in stages: foundations, then structure, then services, then finishing. In Dubai, the Dubai Municipality engineer inspects and must approve before foundations are cast and before a concrete roof slab is cast. This does not apply to a sandwich-panel roof.
- Handover: we review the completed work with you at the end.
For small projects such as an annex or a majlis, a supervising consultant is not required. That does not mean there is no oversight: the required inspections still apply at their stages, and the drawings are still prepared through a licensed engineering office or designer.
The construction method has a big effect on time, comfort and insulation. Compare the options in annex building materials compared. If you are considering a lightweight roof, read our guide to sandwich-panel roof annexes. Our sandwich-panel roofs come with a 10-year roof warranty and a heat-insulation guarantee. A concrete roof has its own inspection requirements, as noted above.
How we deal with you
We do not make big promises, but we set ourselves clear principles on every project:
- Clarity before contracting: we explain the scope, the stages, and what the work includes and excludes, so you know what you are paying for.
- Honest opinions: if a request does not suit the plot, the area or the requirements, we say so and suggest an alternative.
- Inspections tied to stages: in Dubai, foundations and a concrete roof slab are not cast until the municipality engineer has inspected the site and approved the work.
- Authorities as the reference: on regulations, permits and funding we rely on what the relevant body decides, and we do not present general information as a final ruling.
- Direct contact: you reach us on WhatsApp or by phone and can ask about your project whenever you wish.
Where we work
Most of our projects are in Dubai. Built projects there include Al Mizhar, Al Barsha, Al Quoz, Nad Al Hamar, Al Khawaneej, Mirdif and Al Mankhool, while our designs also cover other areas such as Al Warqaa, Al Twar, Al Safa and Al Qusais. We have also built outside Dubai, including an external majlis in Al Juraina, a majlis in Al Dhaid and the Al Zubair heritage rest house in Sharjah, and a residential villa and a majlis in Al Ain. In Hatta we have a design for a modern rest house with a pool. If your site is elsewhere, message us and we will tell you whether we can serve you there.
Support for MBRHE beneficiaries
Many clients build with MBRHE support, through either the grant or the loan, and we know the general picture from practice. With a grant, MBRHE pays the contractor for each approved stage. With a loan, financing goes through Emirates Islamic: the bank pays the contractor in stages, the owner repays the bank monthly, and MBRHE bears the profit on its approved amount. Conditions, amounts and payment mechanics are set by MBRHE alone, so we always go back to its official channels and recommend you do the same. More in our guide to funding an annex with a grant or loan.
Real projects you can see
The gallery shows both built projects and design-only projects, and each page makes the difference clear. Here are three built examples:



- Modern villa annex in Al Mizhar 1: two master bedrooms, a spacious hall and a prep kitchen.
- Al Zubair heritage rest house, Sharjah: three bedrooms, a pool and shaded outdoor seating.
- Majlis with bathroom and prep kitchen in Al Mankhool: a small space with a practical layout.
- Annex with two bedrooms, hall and kitchen in Al Quoz.
See the rest on our projects page, where you can also filter by type, area, bedrooms and funding type.
The free annex cost calculator app
We offer a free app that helps you estimate the cost of your annex from your own specifications, before you talk to any contractor: you choose the project area, construction type, building height, rooms and services, and the app turns them into an estimate you can review before contacting us. We do not publish our prices on the website because cost changes with the site, the design, the finishes and the construction method, so we clarify the scope with you after a site visit. Read the app guide, and for the factors that drive cost see annex cost in Dubai.
Before you choose a contractor
Whether you choose us or someone else, go through our annex contractor checklist. We prefer clients who decide with full information, because it saves both sides a lot of disagreement later.
How to read our project pages
The gallery has two kinds of work: built projects and design-only projects. Anything that is a design and has not been built is labelled as such, so you do not assume that everything you see is a standing building. Each project has a page that collects its photos, plans and clips, and states the type, area, location and number of bedrooms where available. If a project appeals to you, send it to us and tell us what you like about it, and we will discuss what suits your plot.
How to contact us
- WhatsApp and phone: +971585812370
- The contact page to send your project details.
Send us the plot location, its approximate size, what you plan to build, and whether you will build with MBRHE support or self-funded, and we will reply and arrange a site visit.
Frequently asked questions
Do you handle licensing as well?
We follow up on Dubai Municipality permits with you, and drawings are prepared through a licensed engineering office or designer. Approvals are issued by the relevant authorities, which confirm the requirements for each case.
Do I need a supervising consultant for a small annex or majlis?
A supervising consultant is not required for small projects such as an annex or a majlis, but the required inspections still apply, including Dubai Municipality engineer approval before casting foundations and before casting a concrete roof slab.
How much does an annex cost?
Cost depends on the area, design, finishes and construction method. Try the free app for a first estimate, and message us on WhatsApp so we can clarify the scope after a site visit.
Do you work with MBRHE beneficiaries?
Yes, many of our clients build with MBRHE support. With a grant, MBRHE pays the contractor for each approved stage. With a loan, Emirates Islamic pays the contractor in stages and the owner repays the bank monthly. The conditions are set by MBRHE alone.
Do you build outside Dubai?
We have built in Sharjah and Al Ain as well as Dubai. If your site is in another area, send us its location and we will tell you whether we can serve you there.
What is the difference between a built project and a design project in your gallery?
A built project is a building we actually completed, and its photos show the finished work. A design project is a plan and 3D views that have not been built yet, and its page says so.