Skip to content

Construction Calculators (Quantities) – Dubai & UAE

Free construction calculators for villa, annex and building work in Dubai and the UAE. Each tool starts from what you measure on site, such as the length and height of a wall, and gives you what to order: whole blocks and bags of cement, tonnes of sand, litres of paint, boxes of tiles, steel bars, cables and tank sizes. Every page has one-tap real-life examples (a boundary wall, an annex slab, a majlis floor) so you can see how it works before you enter your own sizes.

Structure and concrete

Masonry and finishes

Earthworks and site

Electrical, cooling, energy and water

Planning

What these calculators do

Every calculator works out quantities from the sizes you enter, shows the formula it used, and lets you print the result or copy a link to share it with your engineer, supplier or contractor. They are planning tools: the approved drawings and your engineer always govern the final quantities.

We are a Dubai contractor for villa annexes, majlis, rest houses and buildings, and we built these tools from the questions owners ask us on site.

Quantities here, costs in the app

These pages give quantities only, never prices. If you want the full cost of an annex, our mobile app brings the quantities together with finish levels and gives an indicative cost. Read how it works in the app guide.

Frequently asked questions

Are the calculators free?

Yes. They are free to use, with no sign-up. Print the result or copy it to send to your team.

Do the calculators give prices?

No. They give quantities only. For the cost of the whole annex, use the cost calculator in our app.

Which units do the calculators use?

Metric units: metres, millimetres, square and cubic metres, kilograms and litres, as used on UAE drawings.

Can I rely on the results for ordering materials?

Treat them as a planning estimate. Check the quantities against the approved drawings and your engineer before ordering.

Scroll to Top