This solar panel calculator for Dubai turns your DEWA bill into a system you can order: enter the kWh on your bill and get the system size in kWp, the number of panels, the roof area they need and the yearly generation for a grid-connected Shams Dubai system. Tap an example to see a villa, an annex or a 12-month total, or enter your own roof area to see how much the roof allows. It is a planning estimate from typical Dubai values, and it gives sizes and quantities, no costs.
How the solar system size is calculated
- Yearly consumption = the monthly kWh on the bill × 12, or the 12-month total if you choose that. The units on a DEWA bill are kWh.
- Generation to cover = yearly consumption × the share you want to cover (100 percent covers the yearly total on average).
- Yield: 1 600 kWh per kWp per year by default. This is a planning value for Dubai: roughly 2 200 kWh/m² of sun per year on the plane of the panels × a performance ratio of about 0.73 after dust, heat, wiring and inverter losses. A real design replaces it with a simulation for your roof (1 500 to 1 700 is the usual range). The roof layout then adjusts it: east and west split 0.93, partly shaded 0.85.
- System size (kWp) = generation to cover ÷ yield. kWp is the output of the panels at standard test conditions (1 000 W/m², 25 °C cell temperature, DEWA Regulations 2017 definitions).
- Panels = size × 1 000 ÷ panel watts, rounded up. Panel sizes used: 450 W about 1.95 m², 550 W and 600 W about 2.58 m².
- Roof area = panels × panel area × spacing factor: 1.10 for panels flush on a sloped roof, 1.70 for tilted frames on a flat roof, assuming a tilt of about 20 degrees with the rows spaced so they do not shade each other in winter. Walkways, setbacks and access paths are not included, so allow extra roof for them.
- Limits: if you enter a usable roof area, the panels cannot exceed what fits. If you enter the connected load of the premises and the share DEWA allows, the size cannot exceed that.
- Yearly generation = installed kWp × yield; the share of consumption = generation ÷ yearly consumption. Inverter (AC) = kWp ÷ 1.15, a typical DC to AC ratio.
Worked example: a villa using 2 500 kWh a month
These are the default values and the first example button: tilted frames on a flat roof, 550 W panels, 100 percent cover.
- Yearly consumption: 2 500 × 12 = 30 000 kWh.
- Size: 30 000 ÷ 1 600 = 18.75 kWp.
- Panels: 18.75 × 1 000 ÷ 550 = 34.1, so 35 panels = 19.25 kWp installed.
- Roof: 35 × 2.58 × 1.70 = 153.5 m² of roof.
- Generation: 19.25 × 1 600 = 30 800 kWh a year, about 2 567 kWh a month, which is 103 percent of the consumption.
- Inverter: 19.25 ÷ 1.15 = about 16.7 kW.
The annex example uses 900 kWh a month with only 40 m² of usable roof: 6.75 kWp would be needed (13 panels), but only 9 panels fit, so the system is 4.95 kWp and covers about 73 percent. The third example uses a 12-month total of 42 000 kWh, covers 70 percent with 600 W panels and gives 31 panels, 18.6 kWp and 136 m² of roof, within a 65 kW connected load and 150 m² of roof.
Notes for Dubai and the UAE (Shams Dubai)
- It must be approved by DEWA. Connecting solar PV to the grid is subject to DEWA approval (DEWA Regulations 2017, section 10, Distributed Renewable Resource Generation, Shams Dubai). The application is made online by a DEWA-enrolled solar consultant or contractor with a single-line diagram and the system data (10.2 and 10.3).
- Paperwork before connection: a signed connection agreement (10.4) and an operation and maintenance contract with a solar contractor (10.5). Insurance of the system is recommended (10.6).
- Meters: provide an accessible cabinet for the smart meters DEWA installs: a generation check meter and the net-metering tariff meter (10.8). DEWA inspects and tests the installation (10.9). Labels, warning signs on the DC boxes and an emergency shutdown procedure are required (10.7).
- Self-consumption only. According to DEWA's EV charging regulation (V1.3, clause 5), Executive Council Resolution No. 46 of 2014 restricts PV generation to self-consumption, without supply to third parties, and the allowed PV capacity is determined from the connected load of the premises. Check the capacity limit and the share of the connected load in DEWA's current Shams Dubai connection conditions before you finalise the size.
- Off-grid systems are not allowed for third-party generation under Law No. 27 of 2021 (same regulation, clause 7), with exceptions. This tool sizes a grid-connected system.
- Roof space is shared. Water tanks, AC outdoor units, the stair head and the access and clearances that DEWA and Civil Defense require take part of the roof. Enter your free area in the tool to see the limit.
- Dubai heat and dust. Panels lose output when hot and dirty. The yield above already allows for this, and cleaning keeps it from falling further.
This tool estimates the system size only. For the cost of the whole annex or villa, use the calculator in our app, and size the electrical load with the villa electrical load calculator.
Frequently asked questions
How many solar panels do I need for my villa in Dubai?
Divide your yearly kWh by about 1 600 to get the kWp, then divide by the panel size. A villa using 2 500 kWh a month needs about 19 kWp, which is 35 panels of 550 W. Enter your own bill in the calculator for your number.
How much roof area does a solar system need?
About 7.3 to 8.0 m² per kWp for tilted frames (about 20 degrees) on a flat roof, before walkways and setbacks, and about 4.7 to 5.2 m² per kWp for panels flush on a sloped roof, with these panel sizes. The tool shows the area for your system. Water tanks and AC units on the roof take space from this.
What is kWp?
kWp (kilowatt-peak) is the rated power of the panels under standard test conditions. A 19.25 kWp system has 35 panels of 550 W. It produces about 1 600 kWh for each kWp over a year in Dubai, after losses.
Can I cover 100 percent of my bill with solar?
On average over the year, yes, if the roof and the DEWA capacity limit allow. Output is higher in spring and lower in winter, while consumption peaks in summer, so single months will not match. Shams Dubai works on net metering with a generation meter and a tariff meter.
Does the solar system need DEWA approval?
Yes. A DEWA-enrolled solar consultant or contractor submits the application, DEWA approves the design, the owner signs a connection agreement and an operation and maintenance contract, and DEWA tests and connects the system. Systems that supply third parties or run off-grid are not allowed.
Does it show prices?
No. The tools on this site give sizes and quantities only. To price a project, use the cost calculator in our app.