Cable Size Calculator (Preliminary, Copper) – DEWA Tables

Use this cable size calculator to find a preliminary copper cable size for a circuit in Dubai and the UAE. Enter the load in kW or amps, the cable length and the supply, and it picks the smallest size from the DEWA recommended cable tables that also keeps the voltage drop within the limit. It gives sizes and currents only, not costs.

How the cable size is worked out

  1. Design current. Three-phase: I = P ÷ (√3 × 400 V × power factor). Single-phase: I = P ÷ (230 V × power factor). If you enter amps, that value is used directly.
  2. Current rating. The design current is divided by the extra derating factor (1.00 by default). The smallest size whose "max load current" in the DEWA table is at least that value passes. The tables used are Appendix 5, Table 1 (single-core PVC in concealed conduit), Table 2 (PVC/SWA/PVC armoured) and Table 3 (XLPE/SWA/PVC armoured) of the DEWA Regulations for Electrical Installations, 2017 edition.
  3. Voltage drop. ΔV = k × I × L × (R × cos φ + X × sin φ), with k = √3 for three-phase and 2 for single-phase, L in metres and R, X in mΩ per metre. R is the IEC 60228 resistance of a stranded copper conductor at 20 °C, corrected to the working temperature of the insulation (70 °C for PVC, 90 °C for XLPE) with a factor of 1 + 0.00393 × (θ − 20). X is taken as 0.08 mΩ/m, a typical value. The drop is compared with the limit (4 percent by default, from DEWA section 4.2.3).
  4. Result. The first size in the table that passes both checks. The calculator also shows the maximum breaker rating the table gives for that size, and applies the minimum conductor size for lighting (2.5 mm²) and socket circuits (4 mm²) from section 4.2.2.

Assumptions: copper conductors, nominal supply 230/400 V at 50 Hz, the table value is the cable capacity for "normal situations", and the 10/15 A and 150/160 A rows are read at their lower value. Table 2 prints "65 mm²" in the 160 A row, which is read here as 95 mm². Short-circuit and earth-fault withstand, protection settings, motor starting and harmonics are not checked.

Worked example

A 30 kW three-phase load, 100 m from the supply point, on an armoured XLPE cable, power factor 0.9, normal conditions.

  • Design current: 30 000 ÷ (1.732 × 400 × 0.9) = 48.1 A
  • Current check: 10 mm² has a table maximum of 50 A, so it passes.
  • Voltage drop of 10 mm²: R = 1.83 × 1.275 = 2.333 mΩ/m, so Z = 2.333 × 0.9 + 0.08 × 0.436 = 2.135 mΩ/m. ΔV = 1.732 × 48.1 × 100 × 2.135 ÷ 1000 = 17.8 V, which is 4.45 percent of 400 V. This is over the 4 percent limit.
  • Try 16 mm² (table maximum 60 A): R = 1.15 × 1.275 = 1.466 mΩ/m, Z = 1.355 mΩ/m, ΔV = 11.3 V, which is 2.82 percent. It passes.
  • Suggested size: 16 mm². The voltage drop set the size, not the current. The breaker must be a standard rating from 48.1 A up to 60 A.

Notes for Dubai and the UAE

  • DEWA supplies 230/400 V, 50 Hz, three-phase, four-wire. The Regulations for Electrical Installations require cables to carry the normal current in the laying conditions and the highest ambient temperature, and limit the voltage drop to 4 percent of the nominal voltage unless stated otherwise.
  • Only armoured cables are used for underground installations, normally buried about 90 cm deep with protection and warning tape (DEWA Regulations, section 7).
  • The DEWA tables are recommended minimum sizes for general purposes. The notes under them say to check the manufacturer's data and to allow for laying conditions, voltage drop and correction factors. Use the extra derating factor for hot locations (roofs, direct sun, plant rooms) or cables grouped together. The DEWA regulations give a maximum ambient of 48 °C in shade at coastal sea level, and the table only says "normal situations" without naming an ambient temperature, so treat it as a recommended minimum. As a guide from BS 7671 Table 4B1 (30 °C base), XLPE cable is about 0.87 at 45 °C and 0.82 at 50 °C, and PVC cable about 0.79 at 45 °C and 0.71 at 50 °C.
  • Drawings for a new villa, annex or building are prepared and submitted by a DEWA-registered electrical consultant. This calculator is for early planning and for checking a figure, not for submission.

This tool gives cable sizes only. For the cost of the whole annex, use the calculator in our app.

Frequently asked questions

How do I choose a cable size for a given load?

Work out the current, pick the smallest cable whose current rating covers it, then check the voltage drop over the run length. If the drop is too high, go up one size at a time until it passes. The calculator does both checks.

What voltage drop is allowed in Dubai?

The DEWA Regulations for Electrical Installations (2017) limit the drop from the point of supply to any equipment to 4 percent of the nominal voltage, unless specified otherwise. If the cable is only one part of the run, enter the share of the 4 percent that it may use.

Why does a longer cable need a larger size?

Voltage drop grows with length. A cable that carries the current safely can still drop too much voltage on a long run, so the size is increased until the drop is inside the limit.

Is this the final cable design?

No. It is a preliminary size. Short-circuit and earth-fault checks, the protection device, installation method and local conditions must be checked by a DEWA-registered electrical consultant.

What is the difference between PVC and XLPE cable here?

XLPE insulation works at a higher conductor temperature (90 °C) than PVC (70 °C), so a given size carries more current in the DEWA tables. The two tables list different sizes, and the voltage drop is worked out with the matching temperature.

Does it show prices?

No. The tools on this page give quantities and sizes only. To price an annex, use the cost calculator in our app.