Use this AC size calculator to estimate the cooling load of a room in BTU/h and tons of refrigeration, and to see which standard AC unit size fits. Enter the room size, sun exposure, glass, insulation and number of people. The result is an estimate from typical Dubai values, not a full engineering load calculation, and it gives no costs.
How the AC size is estimated
The calculator adds up the heat that has to be removed from the room, in watts, then converts it. It works one room at a time.
- External walls: U-value × net wall area × (outdoor − indoor temperature + a sun allowance of 3 to 11 K depending on exposure). The net wall area is the wall length × ceiling height minus the glass.
- Roof (top floor only): U-value × floor area × (temperature difference + 30 K for the sun on the roof, which in Dubai heats a roof far above the air temperature).
- Glass: conduction (U × area × temperature difference) plus sun (solar heat gain coefficient × area × peak solar gain × shading factor).
- People: 70 W sensible plus 50 W latent each, a typical value for seated or light activity.
- Lighting and equipment: W per m² × floor area, and the equipment watts you enter.
- Fresh air and leakage: air flow in L/s = the larger of (air changes per hour × room volume ÷ 3.6) and 7.5 L/s per person, so a room full of people always gets enough fresh air. Sensible heat = 1.2 × flow × temperature difference. Latent heat = 3.0 × flow × 9 g/kg moisture difference (ASHRAE coefficients).
The total gets a safety margin (10 percent by default). Then: BTU/h = watts × 3.412, and tons = BTU/h ÷ 12 000 (1 ton = 3.517 kW). The suggested unit is the smallest standard size (9 000, 12 000, 18 000, 24 000, 30 000, 36 000, 48 000 or 60 000 BTU/h) at or above the load. For standard T1 units, rated at 35 °C outdoors, the load is divided by 0.80 because a T1 unit typically loses 20 to 25 percent of its capacity at 46 °C; T3 units are rated at 46 °C and get no reduction.
Typical values used (planning values, not measurements): wall U of 0.57, 1.1 or 2.0 W/m²K and roof U of 0.30, 0.6 or 2.5 for insulated, partly insulated and uninsulated construction; glass U/solar factor of 5.7/0.80 (single clear), 2.8/0.70 (double clear) and 2.0/0.30 (double low-e); peak solar gain through glass of 150, 300, 520 and 560 W/m² for shaded or north, south, east and west; shading factors of 1.0, 0.75 and 0.45. The 45 °C outdoor temperature, the solar gains, the sun allowances and the 9 g/kg moisture difference are typical figures, not code values, and a humid Dubai summer day can carry more latent heat. Check the current Dubai insulation and glazing requirements and the design conditions with the engineer, because your project may use different values.
Worked example
A 20 m² bedroom on the top floor, 3 m high, with 5 m of external west wall, 4 m² of double low-e glass with blinds, insulated to the current code level, 2 people, 10 W/m² lighting, 300 W of equipment, 0.5 air changes per hour, outdoors 45 °C and indoors 24 °C.
- Walls: 0.57 × (5 × 3 − 4 = 11 m²) × (21 + 11) = 201 W
- Roof: 0.30 × 20 × (21 + 30) = 306 W
- Glass conduction: 2.0 × 4 × 21 = 168 W. Glass sun: 0.30 × 4 × 560 × 0.75 = 504 W
- People: 2 × 120 = 240 W. Lighting: 10 × 20 = 200 W. Equipment: 300 W
- Fresh air: 20 × 3 × 0.5 ÷ 3.6 = 8.33 L/s from air changes, but 2 people × 7.5 = 15 L/s is larger, so 15 L/s is used: 1.2 × 15 × 21 = 378 W plus 3.0 × 15 × 9 = 405 W, which is 783 W
- Total: 2 702 W, plus 10 percent = 2 972 W = 10 140 BTU/h = 0.85 tons
- Suggested unit: 12 000 BTU/h (1 ton nominal), T3 class, loaded to 84 percent. That is about 507 BTU/h per m² of floor.
Notes for Dubai and the UAE
- Dubai's summer design temperature is around 45 °C outdoors. The default here is a typical value: your MEP engineer sets the project design temperature and the load calculation.
- Insulation and glazing in new buildings must meet the thermal requirements of the Dubai Building Code and Dubai Municipality's green building requirements. Check the current values for your building category before you rely on the "code level" option.
- In hot weather, many split units lose capacity. Units rated for tropical conditions (T3, 46 °C) keep more of it. Read the capacity table at 46 °C on the data sheet of the model you choose.
- A kitchen, a majlis used by many guests, a room with a lot of glass or a west wall may need a bigger result than the bedroom example. Increase the people, equipment and air changes to match real use.
- Oversizing a unit makes it cycle on and off and can leave the room humid. Aim for the load, not for a big margin.
This tool estimates the cooling load only. For the cost of the whole annex, use the calculator in our app.
Frequently asked questions
How many BTU do I need for a room?
It depends on the area, the sun, the glass, the insulation and the people. A well-insulated 20 m² room may need around 8 000 to 12 000 BTU/h depending on the sun and the number of people, while an uninsulated one with a lot of west-facing single glass can need roughly two to three times more. If the load is within about 10 percent of a unit size, go up to the next size. Enter your own values to see the figure.
How do I convert BTU to tons?
One ton of refrigeration is 12 000 BTU/h, so divide the BTU/h by 12 000. A 24 000 BTU/h unit is 2 tons. In kilowatts, one ton is about 3.517 kW of cooling.
Is a 1.5 ton AC enough for my room?
A 1.5 ton unit gives 18 000 BTU/h. Compare that with the load you get here, after the safety margin. If the load is well below it, a smaller unit usually works better.
What is the difference between T1 and T3 AC units?
T1 units are rated for outdoor temperatures up to 35 °C and T3 units for 46 °C, which is closer to Dubai summer conditions. A T1 unit gives less cooling than its label on the hottest days, so the calculator divides the load by 0.80 for T1.
Can I add up the rooms to size a central system?
Not directly. The rooms do not all peak at the same time, and the system type matters. Size each room here, then let the MEP engineer set the final system.
Does it show prices?
No. The tools on this page give quantities and sizes only. To price an annex, use the cost calculator in our app.