Last updated: 19 November 2026
Welcome to al-mustafa.ae and the Annex Cost Calculator mobile app. These websites and apps are operated by Al Mustafa Contracting, the trading name of Mustafa & Ibrahim Technical Services LLC, Dubai, United Arab Emirates ("we", "us"). By using our website or app you agree to these Terms of Use and Disclaimer. If you do not agree, please do not use them.
1. Use of the website and app
The website and the mobile app are provided for general information and to help homeowners plan building and renovation work. You agree to use them lawfully and not to copy, scrape, disrupt or misuse them.
2. Calculator results are estimates only
The Annex Cost Calculator, in the app and on the website, produces figures based on the inputs you enter and on average rates and assumptions. Please note:
- All results, prices, quantities and timelines are indicative estimates only.
- They are not an offer, a quotation or a contract.
- Actual cost depends on site conditions, design, materials, finishes, authority requirements and market prices at the time of work.
- A binding price is provided only in a written quotation issued by us after a site visit.
3. Project photos and 3D renders
Our galleries include a mix of images: some show 3D design renders prepared at the design stage, and some show construction and handover. 3D design renders illustrate a proposed look, and the final result on site may differ. Where we can, we label each image accordingly.
4. Guides and articles are general information
The guides and articles on our website are general information only. They are not legal, engineering, architectural or financial advice and should not be relied on as such. Building permits, approvals, eligibility conditions and funding or loan rules are set and changed by the relevant authorities and institutions, such as Dubai Municipality, the Mohammed Bin Rashid Housing Establishment (MBRHE) and banks. Please confirm all requirements directly with them, and seek professional advice for your own situation, before making decisions.
5. No affiliation
Al Mustafa Contracting is an independent private company and is not affiliated with, endorsed by or acting on behalf of MBRHE or any other government entity.
6. Intellectual property
Photographs, designs, drawings, renders, texts, logos and the app's software and layout belong to us or are used with permission, and are protected by applicable intellectual property laws. You may not copy, reproduce, modify or republish them for commercial purposes without our prior written consent. Personal, non-commercial viewing and sharing of a link to our pages is welcome.
7. Third-party links
Our website and app may link to third-party services, such as Instagram, app stores and government websites. These are provided for convenience. We do not control them, are not responsible for their content, availability or policies, and your use of them is subject to their own terms.
8. Advertising
Advertising may be shown on our website (Google AdSense) and in our app (Google AdMob). Advertisers are third parties and we do not endorse their products or services. For information on cookies, advertising identifiers and ad personalisation, please read our Privacy Policy: https://al-mustafa.ae/privacy-policy/.
9. Limitation of liability
We make reasonable efforts to keep the content accurate and up to date, but we provide it "as is" and do not guarantee that it is complete, error-free or always available. To the extent permitted by UAE law, we are not liable for any loss or damage arising from your reliance on the website, the app, the calculator results or the content, or from third-party links and advertising. Nothing in these terms excludes liability that cannot be excluded under applicable law.
10. Changes to these terms
We may update these terms from time to time. The "last updated" date above shows the current version, and continued use of the website or app means you accept the updated terms.
11. Governing law
These terms are governed by the laws of the United Arab Emirates as applied in the Emirate of Dubai, and the competent courts of Dubai will have jurisdiction over any dispute.
12. Contact us
For questions about these terms, or to request a site visit and written quotation, contact us at or on +971 58 581 2370.