Work out the water tank capacity a villa, annex or building needs in litres and imperial gallons. Enter the number of people, the building type and how many days of water the tank must hold, and the calculator gives the tank volume with freeboard and the next standard tank size. You can also enter the size of a rectangular or round tank to see how many litres it holds and how many days it lasts. It gives quantities only, in metric units, set up for Dubai and the UAE.
How the water tank capacity calculator works
The calculation has four steps.
- Daily use = number of people × litres per person per day + any extra daily use (garden, pool top-up, washing).
- Water to store = daily use × days of storage.
- Tank volume needed = water to store ÷ (1 − freeboard). Freeboard is the empty space above the water level, so the tank does not overflow. It is 10 percent by default.
- Imperial gallons = litres ÷ 4.54609. The next standard size is the smallest size in a typical list (500, 1,000, 1,500, 2,000, 2,500, 3,000, 4,000, 5,000, 7,500, 10,000, 15,000 and 20,000 litres) that is at least the volume needed. Because tanks are often quoted in gallons, it also gives the next size from a typical imperial gallon list (250, 500, 750, 1,000, 1,500, 2,000, 3,000, 5,000 and 10,000 gallons). The two lists do not match, so use the one your supplier works in.
To find the capacity of a tank from its size, the calculator multiplies the dimensions in metres and converts cubic metres to litres (1 m³ = 1,000 L). A rectangular tank is length × width × water depth. A round tank is π × (diameter ÷ 2)² × water depth. The days it lasts are the capacity divided by the daily use.
Assumptions
- The litres per person per day are typical planning allowances, not code values: 250 for a villa, 200 for an apartment, 150 for labour accommodation, 50 for an office or shop and 45 for a school. Use the figure your consultant gives you if it is different, or choose your own figure.
- The default storage is 1 day (24 hours), which is the minimum DEWA asks for residential premises. Labour accommodation and high-consumption facilities need 2 days (48 hours). The calculator warns you when you enter less.
- The standard sizes are typical catalogue sizes. Your supplier's real sizes and outside dimensions can differ.
- Fire-fighting water is not included. When it is required it is a separate tank sized under the fire code.
Worked example
A villa with 8 people, using the villa allowance of 250 litres per person per day, 1 day of storage (the DEWA minimum for residential premises) and 10 percent freeboard.
- Daily use: 8 × 250 = 2,000 L
- Water to store: 2,000 × 1 = 2,000 L
- Tank volume needed: 2,000 ÷ 0.9 = 2,222 L, which is 489 imperial gallons (2,222 ÷ 4.54609)
- Next standard size: 2,500 L (550 imperial gallons), or 500 imperial gallons (2,273 L) from the gallon list
- A tank of 2.5 × 2 m with 1 m of water depth holds 2.5 × 2 × 1 = 5 m³ = 5,000 L, which lasts 5,000 ÷ 2,000 = 2.5 days.
Notes for Dubai and the UAE
- DEWA requires the consumer storage tank to be at ground level or underground. Elevated tanks are not permitted as the main tank, and the supply line from the meter connects directly to that tank with no branches or bypass. Pumps are not allowed upstream or downstream of the meter. A roof tank, if you want one, is a secondary tank filled by a pump from the ground tank, not from the meter. Confirm the arrangement with your consultant (DEWA domestic meter installation guidelines for villas, items 11, 15 and 23).
- DEWA asks for storage equal to 24 hours of demand for residential premises and 48 hours for labour accommodation and high-consumption facilities (item 10). A half-inch meter supplies up to 18 m³ per 24 hours and a 1-inch meter up to 50 m³, so a daily use above 18,000 litres needs a 1-inch meter.
- A gate valve must be fitted near the tank for maintenance (in a separate manhole for an underground tank), and tanks deeper than 1.0 m need GRP ladders fixed permanently inside (item 12).
- Tanks for drinking water should be made of a material suitable for potable water, be covered and have an insect screen on the vent. The authorities set the requirements for storage tanks and water quality, so confirm them with your MEP consultant and the relevant authority (Dubai Municipality and DEWA) before you order.
- Any tank in the sun heats up in the summer. Shading or insulating the tank and the pipes helps, and your consultant can advise on the location.
- If the ground tank is built in reinforced concrete, it needs waterproofing and a water-tightness test. Use our concrete calculator for the volume of the walls and slabs.
- Tank capacities are often quoted in imperial gallons, so the results show both litres and imperial gallons. 1 imperial gallon is 4.54609 litres, and it is not the same as a US gallon.
This tool gives capacities only. For the cost of the whole project, use the calculator in our app.
Frequently asked questions
How do I calculate the water tank capacity for a house?
Multiply the number of people by the litres each person uses per day, add any extra use such as a garden or pool, then multiply by the days of storage. For 8 people at 250 litres a day and 1 day, that is 2,000 litres before freeboard.
How many litres of water does a person use per day?
It depends on the building and the habits of the household. Planning figures of 150 to 250 litres per person per day are common for homes. The calculator uses 250 for a villa and lets you change it. Your consultant's design figure always comes first.
What is freeboard and why add it?
Freeboard is the empty space between the water surface and the top of the tank, so the tank does not overflow when the float valve works. We add 10 percent by default. If the rating on the tank is its full brim volume, a tank sold as 5,000 litres supplies about 4,500 litres of usable water. Many catalogue ratings are already measured to the overflow level, so ask your supplier which one applies.
How do I convert litres to gallons?
Divide the litres by 4.54609 for imperial gallons, which are the gallons used in the UAE. Divide by 3.78541 for US gallons. The calculator shows imperial gallons.
How many days of water should a tank store?
DEWA requires the consumer tank to hold 24 hours of demand for residential premises, which is 1 day, and 48 hours (2 days) for labour accommodation and high-consumption facilities. Use more if the supply is unreliable or the building is remote. The calculator lets you set between half a day and 14 days, and warns you when you go below the DEWA minimum.
Can I use it for a round or rectangular tank?
Yes. Tick the option to calculate from dimensions, choose the shape and enter the size in metres. Use the water depth up to the overflow, not the full height of the tank.