Skip to content

Stair Calculator: Risers, Treads and Stair Concrete

Use this stair calculator to work out how many risers and treads a staircase needs from the floor-to-floor height and the run you have available, and to check the riser and tread sizes against the Dubai Building Code limits. It also gives the stringer length, the concrete for a waist-slab stair (with the half landing of a U-shaped stair), the formwork under the stair and the tile or marble area for the steps. Choose a straight or U-shaped stair, or tap one of the examples. It gives quantities only, in metric units, for villa and annex stairs in Dubai and the UAE.

How the stair calculator works

  • Number of risers = floor-to-floor height ÷ your preferred riser, rounded. The riser is then H ÷ n, so every riser is equal.
  • Number of treads: a straight flight has one tread fewer than risers, because the upper floor is the last step. A U-shaped stair has two flights (ceil(n ÷ 2) and floor(n ÷ 2) risers), each with one tread fewer than its risers, joined by a half landing.
  • Tread depth: your preferred tread is used when the longest flight fits the available run. If not, the tread is the run ÷ the treads of that flight. When that is under 280 mm the calculator removes risers one at a time (taller risers, fewer treads) until the tread is 280 mm or more, as long as the riser stays within the limit. If it cannot fit, you get a warning with the run needed.
  • Comfort check: 2 × riser + tread should be about 550 to 700 mm (a common rule of thumb, not a code requirement).
  • Stringer length per flight = √((risers × riser)² + ((risers − 1) × tread)²).
  • Concrete per flight = width × (stringer length × waist thickness + risers × riser × tread ÷ 2). The first part is the sloping waist slab, the second is the triangular steps on top. The half landing of a U-shaped stair is (2 × width + gap) × width × waist thickness. The waste you enter is added on top. This is an estimating approximation; the engineer's drawings govern.
  • Formwork under the stair = stringer length × width per flight, plus the landing area.
  • Step finish = treads × tread depth × width, and risers × riser height × width, for tiles, marble or granite (no nosing or skirting).

Worked example

A villa U-shaped stair, floor to floor 3.30 m, 2.9 m available for each flight, 1.2 m wide, preferred riser 170 mm and tread 280 mm, waist slab 150 mm, 5 percent concrete waste.

  • Risers: 3,300 ÷ 170 = 19.4, so 19 risers of 3,300 ÷ 19 = 173.7 mm. The flights are 10 and 9 risers.
  • Treads: 9 + 8 = 17, plus the half landing. The longest flight needs 9 × 280 = 2.52 m, which fits in 2.9 m, so the tread stays 280 mm.
  • Comfort: 2 × 173.7 + 280 = 627 mm, inside 550 to 700.
  • Stringers: √((10 × 0.1737)² + (9 × 0.28)²) = 3.06 m and √((9 × 0.1737)² + (8 × 0.28)²) = 2.73 m, total 5.79 m.
  • Concrete: flight 1 is 1.2 × (3.06 × 0.15 + 10 × 0.1737 × 0.28 ÷ 2) = 0.843 m³, flight 2 is 0.754 m³, the landing (2 × 1.2 + 0.1) × 1.2 × 0.15 = 0.450 m³. Total 2.05 m³, 2.15 m³ with 5 percent waste.
  • Formwork: (3.06 + 2.73) × 1.2 + 2.5 × 1.2 = 9.95 m². Step finish: treads 17 × 0.28 × 1.2 = 5.71 m² and risers 19 × 0.1737 × 1.2 = 3.96 m².

The other two examples show a straight annex stair (3.20 m, 5.2 m run, 19 risers of 168.4 mm) and a tight space (2.90 m high with only 3.0 m of run), where the calculator warns that 280 mm treads do not fit and tells you the run needed.

Notes for Dubai and the UAE

  • Villas are covered by Part K (Villas) of the Dubai Building Code 2021, section K.5.5. The limits used here are: riser 100 to 180 mm with no more than 10 mm variation in a flight (K.5.5.2.3), stairway width 1,000 mm or more (K.5.5.2.2), headroom 2.3 m (K.5.5.2.10), handrails 865 to 965 mm and guardrails 1,065 to 1,200 mm (K.5.5.2.5 and K.5.5.2.6). The tread minimum of 280 mm is a general figure: check the DBC.
  • These values were taken from a published compliance assessment that quotes DBC 2021 Part K, not from the code text itself. Confirm every limit against the current DBC and with your consultant before you build.
  • Part K does not require an intermediate landing in a villa stair, whatever the floor-to-floor height, but recommends one above about 4 m. Stairs that are exits in other building types fall under Part B of the DBC and the UAE Fire and Life Safety Code, which limit the height between landings (3.66 m is quoted for Part B). Check which part applies to your building.
  • Finished floor levels matter: if the floor finish on the lower and upper floors differs in thickness, adjust the first and last structural risers so that every finished riser is equal.
  • The waist slab thickness and reinforcement come from the structural drawings. Use the concrete calculator and the steel weight calculator to order the concrete and bars, and the tile calculator for the finish.

This tool counts steps and stair concrete only. For the cost of the whole annex, use the calculator in our app.

Frequently asked questions

How do I calculate the number of steps in a staircase?

Divide the floor-to-floor height by the riser you want (about 170 mm) and round to a whole number. That is the number of risers. A straight flight has one tread fewer, because the upper floor is the last step.

What is the maximum riser and minimum tread in Dubai?

For villas, Part K of the Dubai Building Code 2021 is quoted with risers of 100 to 180 mm, and a general minimum tread of 280 mm. Check the DBC text and your consultant, because other building types follow other rules.

How much space does a staircase need?

A straight flight needs a run of about (risers − 1) × 280 mm, for example 5.04 m for 19 risers. A U-shaped stair with a half landing needs about half of that for each flight, plus the landing, which is why it is common in villas.

How much concrete does a staircase need?

A waist-slab stair of 150 mm with a width of 1.2 m for a 3.3 m floor-to-floor height takes about 2.05 m³ with its landing, or 2.15 m³ with 5 percent waste. Enter your own height, width and slab thickness.

What is the 2R + T rule?

Twice the riser plus the tread should be about 550 to 700 mm for a comfortable stair (about 630 mm is often quoted). It is a rule of thumb, not a legal limit.

Is the result exact?

It is a planning estimate. The approved drawings and your engineer govern the stair geometry and concrete.

Scroll to Top