Use this plaster calculator to work out the cement bags and sand for internal and external cement-sand plaster (لياسة, also called محارة in Arabic). Enter the walls, ceilings and openings, set the thickness and the mix for each side, and see the area, the wet plaster volume, the bags of cement and the cubic metres of sand. It gives quantities only, in metric units, for villa, annex and boundary wall work in Dubai and the UAE.
How the plaster calculator works
Internal and external surfaces are calculated separately, because their thickness and mix often differ. The results are then added together.
- Plastered area = walls (length × height) + ceilings (length × width) + any areas you enter directly, minus doors and windows (width × height). A window is deducted on the inside and on the outside separately.
- Wet plaster = area × thickness (in metres) × (1 + waste). The default waste is 15 percent for droppings, rebound and uneven backgrounds.
- Dry volume = wet plaster × 1.33. Cement and sand shrink when they are wetted and mixed, so the dry materials take about a third more volume than the finished plaster (typical values are 1.25 to 1.35).
- Cement = dry volume ÷ (1 + sand parts) × 1,440 kg/m³. The bags of 50 kg are added up for both sides and then rounded up once.
- Sand = dry volume × sand parts ÷ (1 + sand parts). The tonnes shown use about 1,600 kg/m³ for loose sand (typical range 1,500 to 1,700).
The mix is cement : sand by volume. The defaults are 1 : 4 and 12 mm inside, 1 : 3 and 20 mm outside. These are common planning values, not requirements: the specification of your project governs. Reveals, soffits and returns of openings, extra coats, bonding agents, mesh and paint are not included. For paint use the paint calculator.
Worked example
A small annex room. Inside: walls totalling 28 m (the perimeter of an 8 × 6 m room) and 3 m high, two doors of 0.9 × 2.1 m, and a ceiling of 8 × 6 m. Outside: walls 28 m long and 3.2 m high with three windows of 1.2 × 1.2 m. Inside 12 mm of 1 : 4, outside 20 mm of 1 : 3, with 15 percent waste.
- Internal area: 28 × 3 − 2 × 1.89 + 8 × 6 = 84.00 − 3.78 + 48.00 = 128.22 m².
- External area: 28 × 3.2 − 3 × 1.44 = 89.60 − 4.32 = 85.28 m².
- Internal wet plaster: 128.22 × 0.012 × 1.15 = 1.769 m³. Dry: 2.353 m³. Cement: 2.353 ÷ 5 × 1,440 = 677.7 kg (13.55 bags). Sand: 1.883 m³.
- External wet plaster: 85.28 × 0.020 × 1.15 = 1.961 m³. Dry: 2.609 m³. Cement: 2.609 ÷ 4 × 1,440 = 939.1 kg (18.78 bags). Sand: 1.957 m³.
- Total: 13.55 + 18.78 = 32.34, so 33 bags of cement of 50 kg and 3.84 m³ of sand (about 6.1 tonnes).
Notes for Dubai and the UAE
- Plaster thickness, number of coats and mix are set in the project specification and the approved drawings. Typical values for block walls are about 10 to 15 mm inside and 15 to 25 mm outside, but check yours.
- External plaster is exposed to strong sun and wind. In hot weather the plaster dries too fast, so keep fresh plaster damp (curing) as the consultant instructs, and avoid plastering in direct midday sun.
- Use clean washed sand suitable for plaster. Sand with too much silt or salt can cause cracking and efflorescence, and the specification normally limits both.
- Very uneven block or concrete surfaces need more plaster than the thickness you enter. Raise the waste allowance for those walls.
- A partition or internal wall is plastered on both faces, so enter its length twice. Ceiling plaster is often thinner (about 6 to 10 mm) than wall plaster: the calculator uses the internal thickness for ceilings, so the ceiling result is on the safe side.
- Sand and cement are usually delivered by the truckload and by the bag, so order by the tonne or cubic metre and by the bag, with a little extra.
This tool counts plaster materials only. For the cost of the whole annex, use the calculator in our app.
Frequently asked questions
How do I calculate plaster in cement and sand?
Multiply the plastered area by the thickness in metres to get the wet volume, add the waste, multiply by 1.33 for the dry volume, then split it by the mix ratio. For a 1 : 4 mix, one part in five is cement and four parts in five are sand.
How many bags of cement for 100 m² of plaster?
At 12 mm thick, 1 : 4 mix and 15 percent waste, 100 m² needs about 10.6 bags of 50 kg of cement and 1.5 m³ of sand. At 20 mm and 1 : 3 it is about 22 bags and 2.3 m³. Use the calculator for your own thickness and mix.
What thickness should the plaster be?
The project specification decides. Internal plaster is commonly around 12 mm and external plaster around 20 mm on block walls. Thicker coats are usually applied in two layers.
Which mix ratio should I use?
1 : 4 is common inside and 1 : 3 outside, where the plaster is more exposed. Follow the specification and the engineer: a richer mix is not always better, because it shrinks and cracks more.
Are لياسة and محارة the same thing?
Yes. In the Gulf the plaster work on walls is called «لياسة», and in some other Arab countries «محارة». The calculation is the same.
Is the result exact?
It is a planning estimate based on the sizes you enter. The approved drawings and your engineer always govern the final quantities.