Slab Calculator (Concrete, Steel, Formwork and Hourdi)

Use this slab calculator to work out the concrete, steel and formwork for a roof or floor slab. Enter the slab length, width and thickness, choose a solid slab or a hollow-block (hourdi) ribbed slab, and get the concrete in m³ with the number of ready-mix trucks, the steel in kg (a quick ratio per m³ or your own bar layout), the formwork area in m² and, for hourdi slabs, the number of hollow blocks. It gives quantities only, in metric units, for villa, annex and majlis slabs in Dubai and the UAE. Pick one of the three site examples to see how it works.

How the slab quantities are calculated

Concrete

  • Solid slab: volume = length × width × thickness.
  • Hollow-block (hourdi) slab: the blocks fill the space between the ribs, so concrete is only the topping and the ribs. Block height = overall thickness − topping. Rib pitch = block width + rib width. Concrete per m² of ribbed area = topping + block height × rib width ÷ pitch. A share of the area is solid at full thickness (the edges, the bands over supports and openings, 8 percent by default): volume = area × ((1 − solid share) × concrete per m² + solid share × thickness).
  • Blocks = area × (1 − solid share) ÷ (pitch × block length), plus the waste allowance, rounded up. Blocks are laid end to end along the rib.
  • Order quantity = net volume × (1 + waste), 5 percent by default. Trucks = order ÷ truck size (8 m³ by default), rounded up.

Steel

  • Quick mode: steel = net concrete × a ratio in kg/m³. The defaults are 100 kg/m³ for a solid slab and 130 kg/m³ for a hollow-block slab. These are planning values used for early estimates (solid slabs are usually quoted between about 80 and 130, hourdi slabs between about 100 and 150), not code values. The structural drawing governs.
  • Bar layout mode: steel = bars × length × weight per metre, with weight per metre = π ÷ 4 × d² × 7,850 kg/m³, the nominal mass basis used for rebar (the same as in the rebar calculator). The number of bars in a direction = floor((width − 2 × cover) ÷ spacing) + 1 and the length of a bar = side − 2 × cover. Runs over 12 m (the stock bar length) get laps of 40 diameters, an assumption you should check against your specification. A solid slab has the bottom bars in both directions and an optional top mesh. A hollow-block slab has the bars you choose in every rib (ribs run along the shorter side) and an optional topping mesh.
  • Bends, hooks, extra top bars over supports, trimmer bars at openings, bar chairs and the supporting beams are not included: add them from the drawings.

Formwork and trucks

Formwork = soffit (length × width) + edge forms (perimeter × thickness). Plywood sheets, props, and beam and column shuttering are not included: see the formwork calculator and the concrete calculator.

Worked example

Three real cases, the same as the site examples.

1. Majlis roof 8 × 6 m, solid 200 mm (the default)

  • Concrete: 8 × 6 × 0.2 = 9.60 m³. With 5 percent: 10.08 m³, which is 2 trucks of 8 m³ (one full truck and a last load of 2.1 m³).
  • Steel at 100 kg/m³: 9.6 × 100 = 960 kg, or 1,008 kg to order with 5 percent. That is 20 kg per m² of slab.
  • Formwork: soffit 48 m² + edges 2 × (8 + 6) × 0.2 = 5.6 m², total 53.6 m².

2. Annex roof 10 × 8 m, hollow-block 250 mm

  • Topping 50 mm, block height 200 mm, blocks 400 × 400 mm, ribs 150 mm, so the pitch is 550 mm. Concrete per m² of ribbed area: 0.05 + 0.2 × 150 ÷ 550 = 0.1045 m³.
  • Ribbed area 80 × 0.92 = 73.6 m² gives 7.69 m³. Solid zones 80 × 0.08 × 0.25 = 1.60 m³. Net 9.29 m³, 9.76 m³ to order, 2 trucks. A solid 250 mm slab would need 20 m³.
  • Blocks: 73.6 ÷ (0.55 × 0.4) = 334.5, so 352 blocks with 5 percent.
  • Steel at 130 kg/m³: 1,208 kg net, 1,269 kg to order. Formwork 89 m².

3. Villa floor 12 × 9 m, solid 200 mm, bar layout

  • Concrete: 12 × 9 × 0.2 = 21.60 m³, 22.68 m³ to order, 3 trucks.
  • Bottom bars Ø12 at 150 mm both ways: 60 bars of 11.94 m and 80 bars of 8.94 m = 1,271 kg. Top mesh Ø10 at 200 mm both ways: 45 bars of 11.94 m and 60 bars of 8.94 m = 662 kg.
  • Total 1,933 kg net (17.9 kg per m²), 2,030 kg to order with 5 percent. Formwork 116.4 m².

Notes for Dubai and the UAE

  • Slab thickness, reinforcement, concrete grade and cover are set by the structural drawings approved by Dubai Municipality (or the authority concerned), designed to the Dubai Building Code. Treat this tool as a way to plan the order, not as a design.
  • Hollow-block slabs are called هوردي (hourdi) in the Gulf. Block sizes differ between factories, so check the size and the minimum topping with your supplier and the engineer, and use the sizes of the block you actually buy.
  • Ready-mix concrete (خرسانة, also called باطون) is ordered by the cubic metre and delivered in mixers of about 6 to 9 m³. A roof slab is normally poured in one go, so confirm the number of trucks, the pump and the time of the pour with the supplier. Pouring in the hot midday sun should be avoided, and fresh slabs need curing as the consultant instructs.
  • Roof slabs in the UAE are exposed to strong heat: waterproofing and thermal insulation layers are separate items and are not counted here.
  • The estimate does not include the supporting beams, openings, stairs or cantilever balconies: add them separately.

This tool counts quantities only. For the cost of the whole annex, use the calculator in our app.

Frequently asked questions

How do I calculate the concrete for a slab?

Multiply length by width by thickness in metres. A slab of 8 × 6 m and 200 mm needs 9.6 m³, and about 10 m³ to order with 5 percent waste. The calculator also gives the number of ready-mix trucks.

How much steel does a roof slab need?

A solid slab is commonly estimated at 80 to 130 kg per m³ of concrete, which is about 16 to 26 kg per m² at 200 mm. The exact weight comes from the bar schedule: choose the bar layout option and enter your diameter and spacing to count it.

How many hollow blocks (hourdi) do I need for a slab?

The blocks cover the ribbed area, so the number is area × (1 − solid share) ÷ (rib pitch × block length). A 10 × 8 m slab with 400 × 400 mm blocks and 150 mm ribs needs about 335 blocks, or 352 with 5 percent waste.

Is a hollow-block slab cheaper than a solid slab?

It uses much less concrete (about 9.3 m³ against 20 m³ for the 10 × 8 m example) but needs blocks and more careful work. This tool gives quantities only: for the cost, use our app.

How many trucks do I need to pour a slab?

Divide the concrete to order by the truck size and round up. For 10.08 m³ and 8 m³ mixers that is 2 trucks. Tell the supplier the exact volume so the last load is not over-ordered.

Is the result exact?

It is a planning estimate based on the sizes you enter. The approved drawings and your engineer always govern the final quantities.