This rebar equivalent calculator converts bars of one size into the equivalent number of bars of another size by steel area, and converts a slab or wall bar spacing into the spacing for a different bar size. Say the drawing shows 8 bars of 16 mm but the yard has 20 mm: enter 8, 16 and 20 and it gives the number of 20 mm bars to fix, the steel area provided and the extra steel. It also gives the bar area table (mm² and cm² per bar) and the steel area per metre for any spacing. Quantities only, in metric units, for Dubai and the UAE.
How the bar area conversion is calculated
Area of one bar. A = π ÷ 4 × d², with d in millimetres. A 16 mm bar has 201.1 mm² (2.01 cm²) and a 20 mm bar has 314.2 mm². The steel mass per metre is the area times 7850 kg/m³, the basis of the nominal masses in BS 4449 and ISO 6935.
Replace N bars with another size. Required area = N × A₁. Bars needed = required area ÷ A₂, rounded up to a whole bar, so the steel provided is never less than the drawing. The calculator also lists every standard size, and when it helps, a closer option with two sizes (for example 5 × Ø20 + 1 × Ø16) that you can offer to the engineer.
Required steel area. When the structural calculation gives As in mm², the bars for each size are As ÷ A, rounded up.
Slab and wall bars: spacing and area per metre. Area per metre width As = A × 1000 ÷ s, with the spacing s in millimetres. For the same area with another size, s₂ = A₂ × 1000 ÷ As, rounded DOWN to a multiple of 5, 10 or 25 mm. The calculator also shows the steel in one layer (kg per m² times the area covered) so you can see the weight difference. The tool warns when the new spacing is over 300 mm, because codes limit the bar spacing of slabs and walls (about 2 × the thickness, ACI 318 and EN 1992-1-1), so keep the new bar size close to the drawing.
Limits of equal area. Area is only one check. Crack control, bond, anchorage and lap lengths (which scale with the diameter), minimum clear spacing between bars (the larger of 25 mm and the bar diameter in ACI 318 25.2; EN 1992-1-1 8.2 is similar), cover, effective depth and ductility also depend on the bar size. The engineer must approve every change.
Bar area table
| Diameter (mm) | Area of one bar (mm²) | Area (cm²) | kg per metre |
|---|---|---|---|
| Ø6 | 28.3 | 0.283 | 0.222 |
| Ø8 | 50.3 | 0.503 | 0.395 |
| Ø10 | 78.5 | 0.785 | 0.617 |
| Ø12 | 113.1 | 1.131 | 0.888 |
| Ø14 | 153.9 | 1.539 | 1.208 |
| Ø16 | 201.1 | 2.011 | 1.578 |
| Ø18 | 254.5 | 2.545 | 1.998 |
| Ø20 | 314.2 | 3.142 | 2.466 |
| Ø22 | 380.1 | 3.801 | 2.984 |
| Ø25 | 490.9 | 4.909 | 3.853 |
| Ø28 | 615.8 | 6.158 | 4.834 |
| Ø32 | 804.2 | 8.042 | 6.313 |
| Ø36 | 1017.9 | 10.179 | 7.990 |
| Ø40 | 1256.6 | 12.566 | 9.865 |
Steel area per metre width (mm² per m) by bar size and spacing
| Bar | 100 mm | 125 mm | 150 mm | 175 mm | 200 mm | 250 mm | 300 mm |
|---|---|---|---|---|---|---|---|
| Ø8 | 503 | 402 | 335 | 287 | 251 | 201 | 168 |
| Ø10 | 785 | 628 | 524 | 449 | 393 | 314 | 262 |
| Ø12 | 1131 | 905 | 754 | 646 | 565 | 452 | 377 |
| Ø14 | 1539 | 1232 | 1026 | 880 | 770 | 616 | 513 |
| Ø16 | 2011 | 1608 | 1340 | 1149 | 1005 | 804 | 670 |
| Ø20 | 3142 | 2513 | 2094 | 1795 | 1571 | 1257 | 1047 |
| Ø25 | 4909 | 3927 | 3272 | 2805 | 2454 | 1963 | 1636 |
Worked examples
- Beam, 8 bars of Ø16 replaced by Ø20. Required area 8 × 201.06 = 1,608.5 mm². Bars of Ø20: 1,608.5 ÷ 314.16 = 5.12, so 6 bars (1,885 mm², 17.2 percent more steel). A closer option is 5 × Ø20 + 1 × Ø16 = 1,772 mm² (10.2 percent more) if the engineer accepts two sizes in the layer.
- Slab, Ø12 at 150 mm replaced by Ø10. Area per metre = 113.10 × 1000 ÷ 150 = 754 mm²/m. Ø10 exact spacing = 78.54 × 1000 ÷ 754 = 104.2 mm, so use Ø10 at 100 mm (785 mm²/m, 4.2 percent more). Over a 6 × 8 m slab (48 m²) one layer weighs 296 kg instead of 284 kg.
- Required As = 2,200 mm² with Ø25. 2,200 ÷ 490.87 = 4.48, so 5 bars of Ø25 (2,454 mm², 11.6 percent more).
Notes for Dubai and the UAE
- Reinforcement is commonly B500B to BS 4449 and is stocked in a limited range of sizes. If a size is short on site, the replacement must still be approved by the structural consultant in writing, and the approved drawings or a revised bar schedule must be updated before the steel is fixed.
- Dubai Municipality inspections and the supervising consultant check bar diameter, spacing, cover and laps against the approved drawings before each pour, so a substitution that is not on the drawings can stop the pour.
- Bigger bars have longer laps and anchorage lengths and need more room in narrow beams and columns, so the congestion at beam-column joints must be checked.
- Steel is sold by weight, so the tool shows the weight change of a substitution. The area approach keeps the weight within a few percent of the drawing.
This tool compares steel area and quantities only. For the cost of the whole annex, use the calculator in our app.
Frequently asked questions
How do I convert rebar from one diameter to another?
Keep the steel area the same. Multiply the number of bars by the area of the old bar (π ÷ 4 × d²) and divide by the area of the new bar, then round up. For 8 bars of 16 mm to 20 mm: 8 × 201.06 ÷ 314.16 = 5.12, so 6 bars.
What is the area of a 12 mm, 16 mm or 20 mm bar?
A 12 mm bar has 113.1 mm², a 16 mm bar has 201.1 mm² and a 20 mm bar has 314.2 mm². The bar area table above gives every common size in mm² and cm².
How do I change the spacing when I change the bar size in a slab?
Calculate the area per metre of the drawing, As = A × 1000 ÷ spacing, then divide the area of the new bar by it to get the new spacing, and round down to a practical value. Ø12 at 150 mm gives 754 mm²/m, so Ø10 needs 104 mm, which is Ø10 at 100 mm.
Can I use a different bar size without asking the engineer?
No. Equal area is only one check. Cracking, bond, anchorage, spacing and ductility also depend on the bar size, and the inspection compares the steel with the approved drawings. Ask for written approval from the structural engineer.
Why does the calculator round up and not to the nearest bar?
Rounding down would give less steel than the drawing. Rounding up gives at least the required area, and the calculator shows how much extra steel that means.
Does it show prices?
No. It gives areas and quantities only. To price an annex, use the cost calculator in our app. The approved drawings and your engineer always govern.