Use this interlock paving calculator to plan a driveway, yard or path: enter the length and width of the paved area (and any planters or manholes to leave out) and get the number of pavers to order, the bedding and joint sand in tonnes, the compacted base course in tonnes, and the kerb pieces with the concrete to set them. Tap an example (a villa driveway, an annex path, a yard with planters) to see it work, then type your own sizes. Interlock is called انترلوك in Arabic. It gives quantities only, in metric units, for villa, annex and yard work in Dubai and the UAE.
How the interlock calculator works
The values below are typical. The paver supplier, the consultant's specification and the approved drawings always govern.
- Net area = sum of length × width of the paved areas (or direct m²), minus the areas that are not paved.
- Pavers per m² = 1 ÷ ((length + joint) × (width + joint)), in metres. A 200 × 100 mm paver with a 3 mm joint takes up 203 × 103 mm, so 47.83 per m². Suppliers often quote 50 per m² on the nominal size. For zigzag, dog-bone and other shaped pavers, choose the shaped option and enter the pieces per m² from the supplier data sheet.
- Pavers to order = net area × pavers per m² × (1 + waste), rounded up. The default waste is 5 percent for straight layouts, and 10 percent is common for diagonal or curved ones.
- Bedding sand = net area × bedding thickness (30 mm by default) × 1.10 allowance for an uneven base, at about 1.6 t/m³ loose.
- Joint sand = net area × paver thickness × joint fraction × 1.6 t/m³ × 1.10, where the joint fraction is 1 − (L × W) ÷ ((L + j) × (W + j)). For shaped pavers 4 percent is assumed.
- Base course = net area × base thickness (150 mm by default) × 2.1 t/m³ for compacted graded aggregate × 1.05. The tonnes are the compacted mass, so there is no extra loose-volume factor.
- Kerb pieces = kerb length ÷ piece length × 1.03, rounded up. Kerb concrete = kerb length × 0.04 m³ per metre, which assumes a bed 200 × 100 mm plus a back haunch 100 × 200 mm (an assumption: use your detail).
Not included: extending the base beyond the edge, excavation and spoil removal, geotextile, drainage and sealing. For the kerb concrete mix use the concrete mix calculator.
Worked example: villa driveway 10 × 5 m
A driveway of 10 × 5 m paved with 200 × 100 × 60 mm pavers, a 3 mm joint, 5 percent waste, 30 mm bedding sand, a 150 mm compacted base and 25 m of 1 m kerbs (the two long sides and the front). These are the default inputs.
- Area 10 × 5 = 50 m². Pavers per m² = 1 ÷ (0.203 × 0.103) = 47.83. Pavers: 50 × 47.83 = 2,391.3, so 2,392. With 5 percent: 2,510.9, so 2,511 pavers to order, which is 52.5 m² to buy. If your supplier counts 200 × 100 mm at 50 per m² on the nominal size, the same 52.5 m² is 2,625 pieces. Order by the area (52.5 m²) so both counts agree.
- Bedding sand: 50 × 0.03 × 1.10 = 1.65 m³ × 1.6 = 2.64 t.
- Joint fraction = 1 − 20,000 ÷ 20,909 = 0.0435. Joint sand: 50 × 0.06 × 0.0435 × 1,600 × 1.10 = 229.5 kg. Total sand 2.87 tonnes.
- Base course: 50 × 0.15 = 7.5 m³ compacted × 2.1 × 1.05 = 16.5 tonnes.
- Kerbs: 25 ÷ 1 × 1.03 = 25.75, so 26 pieces. Concrete: 25 × 0.04 = 1.0 m³.
Notes for Dubai and the UAE
- In the UAE, interlock pavers (انترلوك) are commonly 200 × 100 mm and are made 60 mm thick for cars and 80 mm for heavy vehicles, plus shaped and square types. Check the real size, thickness and pieces per m² with your supplier.
- Driveways, parking and service areas inside a villa plot are normally laid on a compacted granular base and a sand bed. The thickness of each layer and the compaction requirement come from the project specification or your consultant. 100 mm, 150 mm and 200 mm are typical base thicknesses for paths, driveways and heavy loads.
- Falls and drainage matter in Dubai because of occasional heavy rain and wash-down water. Pavers should fall away from the building, as the drawings show, and drain to a gully or soakaway where required.
- Pavers laid in the road reserve or outside the plot line, and any kerb, entrance or driveway cut that affects the public road, normally need the authority's approval (Dubai Municipality or the community developer). Check before work starts.
- In summer lay and compact in the cooler hours, screed the bedding sand only as far as you will lay that day, and cure kerb concrete as the specification says. Sweep the joint sand in after the area is compacted.
This tool counts materials only. For the cost of the whole project, use the calculator in our app.
Frequently asked questions
How many interlock pavers per square metre?
A 200 × 100 mm paver with a 3 mm joint needs about 47.8 per m², but suppliers in the UAE usually count and price it at 50 per m² on the nominal size. For 52.5 m² that is 2,511 against 2,625 pieces. Order by area (m²) or ask the supplier for the exact count, and for shaped pavers choose the shaped option and enter the pieces per m² from the data sheet.
How do I calculate the interlock for a driveway?
Multiply the length by the width, subtract planters and manholes, then multiply the net area by the pavers per m² and add 5 to 10 percent for cutting. The calculator also gives the sand, base course and kerbs.
How much sand do I need under and between the pavers?
For a 30 mm bed and 60 mm pavers with 3 mm joints the calculator gives about 2.64 t of bedding sand and 230 kg of joint sand for 50 m². Use washed sand as the specification requires.
How thick should the base be?
Typical bases are 100 mm for paths, 150 mm for driveways and 200 mm for heavy loads, on a compacted subgrade. The consultant's specification governs, and the calculator lets you change the thickness.
Does it include kerbs?
Yes. Enter the kerb length and the piece length (0.5 or 1.0 m) to get the pieces and the concrete for the bed and haunch. Enter 0 if there are no kerbs.
Is the result exact?
It is a planning estimate from the sizes you enter and typical values. The approved drawings, the supplier and your engineer always govern the final quantities.