Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²
Modern villa annex of 130–135 m² in Al Mizhar 1, Dubai: 2 master bedrooms, 3 bathrooms, a living hall and prep kitchen. See design, build, handover.

Key facts
- Area
- 130–135 m²
- Bedrooms
- 2
- Bathrooms
- 3
- Kitchen
- Pantry kitchen
- Location
- Al Mizhar 1, Dubai
- Category
- Annex
- Year / status
- Completed · 2026
- Funding
- MBRHE housing loan
About this project
A modern villa annex whose project posts quote an area between 130 and 135 m². It has two master bedrooms, three bathrooms, a spacious living hall and a prep kitchen. The posts show the floor plan and 3D views, the walls and steps during construction, and the finished bathrooms and washbasins with stone-style finishes.
Project photos
3D design
Construction
Handover
Facilities
- Living hall
- Prep kitchen
- Two master bedrooms
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified
Annex30Villa annex, 3 bedrooms – Al Khawaneej, Dubai — 195 m²Al Khawaneej, DubaiSome details not specified












