Design: villa annex, 1 bedroom – Al Qusais, Dubai
Villa annex design in Al Qusais, Dubai, with 1 bedroom, a living area, 2 bathrooms and a prep kitchen. View the design images and request a similar quote.

Key facts
- Bedrooms
- 1
- Bathrooms
- 2
- Kitchen
- Pantry kitchen
- Location
- Al Qusais, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
Annex with a bedroom with a bathroom, a hall with a bathroom and washbasins and a prep kitchen, with a white and wood panel facade and large glazing, designed to the client's needs. The project posts show the design.
Project photos
3D design
Facilities
- Living hall
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified












