Design: villa annex, 2 bedrooms – Warsan, Dubai
Villa annex design in Warsan, Dubai: 2 bedrooms, dressing room, hall, 3 bathrooms, prep kitchen, laundry room and balcony, with a white facade and pergola.

Key facts
- Bedrooms
- 2
- Bathrooms
- 3
- Kitchen
- Pantry kitchen
- Location
- Warsan, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
Annex with two bedrooms with bathroom and dressing room, a hall with a bathroom, a prep kitchen with a small dining spot, a laundry room and an external balcony, with a white facade, wood soffit and front pergola. The project posts show the design.
Project photos
3D design
Facilities
- Living hall
- Dining room
- Laundry
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified









