Annex and majlis projects in Al Mizhar, Dubai

Modern villa annex — 130–135 m² - Handover

Al Mizhar (including Al Mizhar 1) is a residential area in the east of Dubai. This page gathers the villa annex, majlis and rest house projects Al Mustafa has designed or built in Al Mizhar, Dubai, with the key facts of each, what owners here usually build, and the services and guides to read before you plan your own.

In short

  • 3 projects in Al Mizhar: 2 annexes, 1 majlis; 1 completed and 2 at design stage.
  • Areas range from 107 to 135 m2 where an area is quoted.
  • Permit drawings are prepared through a Dubai Municipality registered consultant or engineering office, and the contractor builds from the approved drawings.

Projects in Al Mizhar

Modern villa annex, 2 bedrooms, Al Mizhar 1, Dubai - 130–135 m²

Modern villa annex, 2 bedrooms, Al Mizhar 1, Dubai - 130–135 m²

Villa annex, 130–135 m2, 2 bedrooms, 3 bathrooms, prep kitchen, two master bedrooms, completed project, financed through an MBRHE housing loan.

majlis and gym room, Al Mizhar, Dubai - 107 m²

majlis and gym room, Al Mizhar, Dubai - 107 m²

Majlis, 107 m2, majlis, game room (gym) and bathroom, design project.

villa annex, 2 bedrooms, with outdoor seating, Al Mizhar, Dubai - 112 m²

villa annex, 2 bedrooms, with outdoor seating, Al Mizhar, Dubai - 112 m²

Villa annex, 112 m2, 2 bedrooms, 2 bathrooms, prep kitchen, design project.

What owners in Al Mizhar usually build

Al Mizhar has our largest modern annexes: a completed 130 to 135 m2 annex in Al Mizhar 1 with two master bedrooms, three bathrooms, a spacious hall and a prep kitchen, a 112 m2 two-bedroom annex designed with outdoor seating, and a 107 m2 majlis with a game room (gym). Owners here often plan for bigger households and combine a majlis with leisure space.

Practical checks for a plot in Al Mizhar

  • Electricity: a new annex or majlis usually needs DEWA to review the load and the connection; see the DEWA connection guide.
  • Funding: if you plan to use a housing grant or loan, read the funding guide before you fix the design, because the approved scope matters.
  • Existing buildings: if part of the plot already has an unlicensed addition, see how to license an existing annex first.
  • Drawings and site: bring your plot documents and photos of the site and the villa to the first meeting so the first layout is realistic.

Planning your own project in Al Mizhar

  1. Define the need. Guest annex, family hall, majlis for hosting, or a mix. The annex cost guide explains what drives the budget without quoting prices.
  2. Design. See our annex design service, villa design service and majlis design ideas.
  3. Permit. Read the building permit guide. Permit procedures in some areas, such as master-developer communities, follow other authorities, so confirm which authority issues the permit for your plot.
  4. Build. Choose a contractor registered with Dubai Municipality and working within its class, as explained in approved contractors and materials. Our annex construction service and villa construction service cover execution.

To see every project we have published, visit our projects, or contact us to arrange a site visit in Al Mizhar.