Skip to content

Design: majlis – Al Mamzar, Dubai — 63 m²

Majlis design of 63 m² (11.55 x 5.4 m) with a white facade, wood panels, glass front, bathroom, prep kitchen and interior views in Al Mamzar, Dubai.

Design: majlis – Al Mamzar, Dubai — 63 m²

Key facts

Area
63 m²
Bathrooms
1
Kitchen
Pantry kitchen
Location
Al Mamzar, Dubai
Category
Majlis
Year / status
Design stage

About this project

Majlis of 11.55 x 5.4 m (about 63 m²) with a white facade, wood panels and a glass front, plus a bathroom, washbasins, a prep kitchen and interior views. The project posts show the design.

Facilities

  • Majlis
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top