Design: majlis – Al Twar, Dubai — 62 m²
Design of a 62 m² majlis (10.55 x 5.9 m) with a timber-clad sloping roof, stone piers, full-height glazing, bathroom and prep kitchen in Al Twar, Dubai.

Key facts
- Area
- 62 m²
- Bathrooms
- 1
- Kitchen
- Pantry kitchen
- Location
- Al Twar, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis of 10.55 x 5.9 m (about 62 m²) with a timber-clad sloping roof, stone piers and full-height glazing, plus a bathroom, washbasins and a prep kitchen. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified























