Design: villa annex, 1 bedroom – Umm Al Sheif, Dubai — 85 m²
Design of an 85 m² villa annex in Umm Al Sheif, Dubai: a bedroom with bathroom and dressing room, a hall with bathroom, with a beige facade.

Key facts
- Area
- 85 m²
- Bedrooms
- 1
- Bathrooms
- 2
- Location
- Umm Al Sheif, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
Annex of 85 m² with a bedroom with a bathroom and dressing room and a hall with a bathroom, with a beige and white facade. The project posts show the design.
Project photos
3D design
Facilities
- Living hall
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified










