Design: family majlis with outdoor seating – Al Rashidiya, Dubai — 60 m²
Family majlis design with outdoor seating in Al Rashidiya, Dubai, 60 m², with a bathroom and wash basins. View the design images and request a quote.

Key facts
- Area
- 60 m²
- Location
- Al Rashidiya, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Family majlis with outdoor seating — 60 m². Details from the project posts: area 60 m²; bathroom and wash basins.
Project photos
3D design
Facilities
- Majlis
- Wash basins
- Outdoor seating
- Bathroom and wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified












