Villa annex, 1 bedroom
Annex with a majlis, a bedroom with dressing room, a prep kitchen and a private pool, with a flat roof and black windows. See the design and photos.

Key facts
- Bedrooms
- 1
- Bathrooms
- 2
- Kitchen
- Pantry kitchen
- Category
- Annex
- Year / status
- Completed
About this project
Annex with a majlis, a bedroom with a dressing room, a prep kitchen and a private pool with blue loungers, with a flat-roof facade and black-framed windows. The project posts show the design and finished photos.
Project photos
3D design
Handover
Facilities
- Majlis
- Swimming pool
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified












