Skip to content

Annex and majlis projects in Al Qusais, Dubai

Villa annex, 1 bedroom - Al Qusais, Dubai - 3D design

Al Qusais is a long-established residential area in north-east Dubai. This page gathers the villa annex, majlis and rest house projects Al Mustafa has designed or built in Al Qusais, Dubai, with the key facts of each, what owners here usually build, and the services and guides to read before you plan your own.

In short

  • 3 projects in Al Qusais: 1 annex, 1 majlis and 1 other; 0 completed and 3 at design stage.
  • Areas range from 60 to 60 m2 where an area is quoted.
  • Permit drawings are prepared through a Dubai Municipality registered consultant or engineering office, and the contractor builds from the approved drawings.

Projects in Al Qusais

villa annex, 1 bedroom, Al Qusais, Dubai

villa annex, 1 bedroom, Al Qusais, Dubai

Villa annex, 1 bedroom, 2 bathrooms, design project.

majlis, Al Qusais, Dubai - 60 m²

majlis, Al Qusais, Dubai - 60 m²

Majlis, 60 m2, 1 bathroom, design project.

family rest house with 4 bedrooms and majlis, Al Qusais, Dubai

family rest house with 4 bedrooms and majlis, Al Qusais, Dubai

Family rest house, 4 bedrooms, design project.

What owners in Al Qusais usually build

The Al Qusais projects in our catalog show three different needs on three different plots: a one-bedroom annex with two bathrooms, a 60 m2 majlis, and a larger family rest house with four bedrooms and a majlis. The range shows that owners here build for different reasons, from a guest suite to a full family retreat, and the first step is deciding which of the three you are really after.

Practical checks for a plot in Al Qusais

  • Electricity: a new annex or majlis usually needs DEWA to review the load and the connection; see the DEWA connection guide.
  • Funding: if you plan to use a housing grant or loan, read the funding guide before you fix the design, because the approved scope matters.
  • Existing buildings: if part of the plot already has an unlicensed addition, see how to license an existing annex first.
  • Drawings and site: bring your plot documents and photos of the site and the villa to the first meeting so the first layout is realistic.

Planning your own project in Al Qusais

  1. Define the need. Guest annex, family hall, majlis for hosting, or a mix. The annex cost guide explains what drives the budget without quoting prices.
  2. Design. See our annex design service, villa design service and majlis design ideas.
  3. Permit. Read the building permit guide. Permit procedures in some areas, such as master-developer communities, follow other authorities, so confirm which authority issues the permit for your plot.
  4. Build. Choose a contractor registered with Dubai Municipality and working within its class, as explained in approved contractors and materials. Our annex construction service and villa construction service cover execution.

To see every project we have published, visit our projects, or contact us to arrange a site visit in Al Qusais.

Scroll to Top