Design: villa annex, 2 bedrooms – Umm Suqeim, Dubai
Design of a villa annex in Umm Suqeim, Dubai: master and kids bedrooms with their own bathrooms, plus a hall, bathroom and prep kitchen. Request a quote.

Key facts
- Bedrooms
- 2
- Bathrooms
- 3
- Kitchen
- Pantry kitchen
- Location
- Umm Suqeim, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
Annex with a master bedroom and a kids bedroom each with a bathroom, a hall with a bathroom and a prep kitchen, with grey panel facade and a recessed wood entrance. The project posts show the design.
Project photos
3D design
Facilities
- Living hall
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified











