Residential villa, 4 rooms (3 bedrooms + maid’s room) – Al Sarooj, Al Ain, Abu Dhabi — 235 m²
Single-storey villa of 235 m² in Al Sarooj, Al Ain: 4 rooms (3 bedrooms + maid's room), 5 bathrooms, a hall, kitchen and laundry. Design, build, handover.

Key facts
- Area
- 235 m²
- Bedrooms
- 3
- Bathrooms
- 5
- Kitchen
- Full kitchen
- Location
- Al Sarooj, Al Ain, Abu Dhabi
- Category
- Architectural design
- Year / status
- Completed · 2023
- Funding
- Self-funded
About this project
A single-storey residential villa of 235 square metres in Al Sarooj, Al Ain, Abu Dhabi, built and handed over in 2023. It has four rooms: three bedrooms, all of them master bedrooms according to the project post, plus a maid's room, which the owner counts as a room. There are five bathrooms, and the layout suits a medium-sized family that prefers living on one level.
Alongside the bedrooms and the maid's room, the villa has a living hall, a kitchen and a laundry and ironing room. Keeping the laundry and ironing in its own room helps the rest of the house stay tidy, the maid's room gives the worker a separate space, and the number of bathrooms meets the needs of the family and its guests.
The photos show the exterior with stone-style cladding, the windows, the air-conditioning units and the wall lights, while the surrounding ground was still unlandscaped when photographed. The gallery documents three stages, design, construction and handover, with photos and videos for each.
When building a similar villa, an owner can adjust the number and arrangement of rooms, choose the exterior cladding, the interior finishes and the window style, and decide the roof type between sandwich panel and concrete, according to budget and the nature of the plot. These are options, not specifications of this villa.
This type of villa suits those who want rooms and facilities arranged on a single level, with no need for stairs between the bedrooms, the hall and the kitchen.
If you would like a villa close to this design, request a quote from Al Mustafa Contracting.
Project photos
3D design
Construction
Handover
Facilities
- Living hall
- Maid room
- Laundry
- Kitchen
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app





















































