Design: majlis – Al Barsha South, Dubai — 41 m²
Design of a 41 m² majlis (8.4 x 4.9 m) with a white facade, timber lintel, sliding glass door, a bathroom and washbasins in Al Barsha South, Dubai.

Key facts
- Area
- 41 m²
- Bathrooms
- 1
- Location
- Al Barsha South, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis of 8.4 x 4.9 m (about 41 m²) with a white box facade, a timber lintel and a sliding glass door, plus a bathroom and washbasins. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified















