Skip to content

Design: majlis – Al Warqaa, Dubai — 37 m²

Design of a small 37 m² majlis (8.4 x 4.4 m) in Al Warqaa, Dubai with a white facade and double glazing, plus a bathroom, washbasins and gypsum decor.

Design: majlis – Al Warqaa, Dubai — 37 m²

Key facts

Area
37 m²
Bathrooms
1
Location
Al Warqaa, Dubai
Category
Majlis
Year / status
Design stage

About this project

Small majlis measuring 8.4 x 4.4 m (about 37 m²) with a white facade, a wood band and double glazing, plus a bathroom, washbasins and gypsum board decor. The project posts show the design.

Facilities

  • Majlis
  • Wash basins

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top