Design: majlis – Al Manara, Dubai — 50 m²
Design of a 50 m² glass-pavilion majlis (about 10 x 5 m) with a bathroom, prep kitchen, gypsum board finishing and lighting in Al Manara, Dubai.

Key facts
- Area
- 50 m²
- Bathrooms
- 1
- Kitchen
- Pantry kitchen
- Location
- Al Manara, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Glass-pavilion majlis of about 10 x 5 m (50 m²) with a bathroom and a prep kitchen, with gypsum board finishing, lighting, insulation and warranty. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified






















