Skip to content

Annex and majlis projects in Nad Al Hamar, Dubai

Annex with master bedroom and hall — 63.5 m² - Handover

Nad Al Hamar is a residential area in the east of Dubai. This page gathers the villa annex, majlis and rest house projects Al Mustafa has designed or built in Nad Al Hamar, Dubai, with the key facts of each, what owners here usually build, and the services and guides to read before you plan your own.

In short

  • 3 projects in Nad Al Hamar: 2 annexes, 1 majlis; 1 completed and 2 at design stage.
  • Areas range from 35 to 63.5 m2 where an area is quoted.
  • Permit drawings are prepared through a Dubai Municipality registered consultant or engineering office, and the contractor builds from the approved drawings.

Projects in Nad Al Hamar

Annex with master bedroom and hall, Nad Al Hamar, Dubai - 63.5 m²

Annex with master bedroom and hall, Nad Al Hamar, Dubai - 63.5 m²

Villa annex, 63.5 m2, 1 bedroom, completed project.

majlis, Nad Al Hamar, Dubai - 35 m²

majlis, Nad Al Hamar, Dubai - 35 m²

Majlis, 35 m2, 1 bathroom, design project.

annex, Nad Al Hamar, Dubai

annex, Nad Al Hamar, Dubai

Villa annex, design project.

What owners in Nad Al Hamar usually build

Compact projects dominate in Nad Al Hamar: a completed annex of 63.5 m2 with a master bedroom and a hall, a 35 m2 majlis design with a white pergola, and a further annex design. Small footprints reward careful planning, because every square metre has to work: the layout, door positions and storage decide whether a small annex feels comfortable.

Practical checks for a plot in Nad Al Hamar

  • Electricity: a new annex or majlis usually needs DEWA to review the load and the connection; see the DEWA connection guide.
  • Funding: if you plan to use a housing grant or loan, read the funding guide before you fix the design, because the approved scope matters.
  • Existing buildings: if part of the plot already has an unlicensed addition, see how to license an existing annex first.
  • Drawings and site: bring your plot documents and photos of the site and the villa to the first meeting so the first layout is realistic.

Planning your own project in Nad Al Hamar

  1. Define the need. Guest annex, family hall, majlis for hosting, or a mix. The annex cost guide explains what drives the budget without quoting prices.
  2. Design. See our annex design service, villa design service and majlis design ideas.
  3. Permit. Read the building permit guide. Permit procedures in some areas, such as master-developer communities, follow other authorities, so confirm which authority issues the permit for your plot.
  4. Build. Choose a contractor registered with Dubai Municipality and working within its class, as explained in approved contractors and materials. Our annex construction service and villa construction service cover execution.

To see every project we have published, visit our projects, or contact us to arrange a site visit in Nad Al Hamar.

Scroll to Top