Annex with master bedroom and hall – Nad Al Hamar, Dubai — 63.5 m²
63.5 m² annex with a master bedroom and a hall in Nad Al Hamar, Dubai. See the design, handover photos and handover video of the finished project.

Key facts
- Area
- 63.5 m²
- Bedrooms
- 1
- Location
- Nad Al Hamar, Dubai
- Category
- Annex
- Year / status
- Completed
About this project
Annex with master bedroom and hall — 63.5 m². Details from the project posts: area 63.5 m²; 1 bedroom(s).
Project photos
3D design
Handover
Facilities
- Living hall
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified












