Design: villa annex, 1 bedroom – Sharjah — 108 m²
Design of a 108 m² villa annex with an outer liwan in Sharjah: a bedroom, majlis, prep kitchen and two bathrooms, with a wood-fin and glass facade.

Key facts
- Area
- 108 m²
- Bedrooms
- 1
- Bathrooms
- 2
- Kitchen
- Pantry kitchen
- Location
- Sharjah
- Category
- Annex
- Year / status
- Design stage
About this project
Annex of 108 m² plus an outer liwan in Sharjah, with a long facade of vertical wood fins and glass, including a bedroom, a majlis, a prep kitchen and bathrooms for the room and the hall. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Living hall
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified










