Al Khawaneej is a residential area in the east of Dubai with many villa plots. This page gathers the villa annex, majlis and rest house projects Al Mustafa has designed or built in Al Khawaneej, Dubai, with the key facts of each, what owners here usually build, and the services and guides to read before you plan your own.
In short
- 3 projects in Al Khawaneej: 2 annexes, 1 majlis; 1 completed and 2 at design stage.
- Areas range from 97 to 195 m2 where an area is quoted.
- Permit drawings are prepared through a Dubai Municipality registered consultant or engineering office, and the contractor builds from the approved drawings.
Projects in Al Khawaneej
Villa annex, 3 bedrooms, Al Khawaneej, Dubai - 195 m²

Villa annex, 195 m2, 3 bedrooms, 3 bathrooms, with kitchen and store, completed project.
villa annex, 1 bedroom, Al Khawaneej, Dubai - 97 m²

Villa annex, 97 m2, 1 bedroom, 1 bathroom, master bedroom, design project.
majlis, Al Khawaneej, Dubai

Majlis, 1 bathroom, design project.
What owners in Al Khawaneej usually build
In our catalog, the Al Khawaneej projects lean towards family space: a 195 m2 three-bedroom annex built around a family hall with a kitchen and a store, a one-bedroom annex of 97 m2 designed with outdoor seating, and a majlis design. Owners here tend to ask for a hall that the whole family can share and a sitting area that opens to the garden, so the plan is usually drawn around the hall and the outdoor space first.
Practical checks for a plot in Al Khawaneej
- Electricity: a new annex or majlis usually needs DEWA to review the load and the connection; see the DEWA connection guide.
- Funding: if you plan to use a housing grant or loan, read the funding guide before you fix the design, because the approved scope matters.
- Existing buildings: if part of the plot already has an unlicensed addition, see how to license an existing annex first.
- Drawings and site: bring your plot documents and photos of the site and the villa to the first meeting so the first layout is realistic.
Planning your own project in Al Khawaneej
- Define the need. Guest annex, family hall, majlis for hosting, or a mix. The annex cost guide explains what drives the budget without quoting prices.
- Design. See our annex design service, villa design service and majlis design ideas.
- Permit. Read the building permit guide. Permit procedures in some areas, such as master-developer communities, follow other authorities, so confirm which authority issues the permit for your plot.
- Build. Choose a contractor registered with Dubai Municipality and working within its class, as explained in approved contractors and materials. Our annex construction service and villa construction service cover execution.
To see every project we have published, visit our projects, or contact us to arrange a site visit in Al Khawaneej.