Design: majlis – Umm Suqeim, Dubai — 80 m²
Design of an 80 m² single-storey majlis in Umm Suqeim, Dubai, with a bathroom and washbasins; day and evening views with the floor plan. Request a quote.

Key facts
- Area
- 80 m²
- Bathrooms
- 1
- Kitchen
- No kitchen
- Location
- Umm Suqeim, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
An 80 m² majlis with a bathroom and washbasins, according to the project post. The floor plan shows a large seating hall with two central tables and built-in seating along the walls. The gallery has four views of a single-storey building with a flat roof and wall lights, in day and evening versions, each with the plan below.
Project photos
3D design
Facilities
- Majlis
- Wash basins
- Bathroom
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified






