Design: majlis – Za’abeel, Dubai — 122 m²
Design of a 122 m² majlis in Za'abeel, Dubai with a stone and wood facade and glass sliding doors, plus outdoor seating, bathroom and prep kitchen.

Key facts
- Area
- 122 m²
- Bathrooms
- 1
- Kitchen
- Pantry kitchen
- Location
- Za'abeel, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis with a stone and wood facade and large sliding glass doors, about 12.2 x 10 m with an outdoor seating area, a bathroom, washbasins and a prep kitchen. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Wash basins
- Outdoor seating
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified








