Design: majlis with bathroom, wash basins and prep kitchen – Al Rowaiyah, Dubai — 66 m²
Design of a 66 m² majlis in Al Rowaiyah, Dubai, with a bathroom, wash basins and a prep kitchen. Request a quote for a similar project from Al Mustafa.

Key facts
- Area
- 66 m²
- Kitchen
- Pantry kitchen
- Location
- Al Rowaiyah, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Majlis with bathroom, wash basins and prep kitchen — 66 m². Details from the project posts: area 66 m².
Project photos
3D design
Construction
Facilities
- Majlis
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified









