Skip to content

Rest house, 6 bedrooms — 652 m²

Family rest house of 652 m² with a Syrian stone facade: 6 bedrooms, each with a bathroom and dressing room, a hall, a kitchen and a covered indoor pool.

Rest house, 6 bedrooms — 652 m²

Key facts

Area
652 m²
Bedrooms
6
Bathrooms
7
Kitchen
Pantry kitchen
Category
Rest house
Year / status
Completed

About this project

Family rest house of 652 m² with six bedrooms each with a bathroom and dressing room, a hall with a bathroom and washbasins, a kitchen and a covered indoor pool, with a Syrian stone facade, designed and built, with handover photos. The project posts show the design and finished photos.

Facilities

  • Living hall
  • Wash basins
  • Swimming pool
  • Majlis
  • Dining room

Planning something similar?

Send us this project and we will reply with a visit and an estimate.

Similar projects

Scroll to Top