Design: majlis – Al Awir, Dubai — 54 m²
Heritage majlis design of 54 m² with a sandy facade, mashrabiya panels, bathroom, prep kitchen and dining room in Al Awir, Dubai. Design images and video.

Key facts
- Area
- 54 m²
- Bathrooms
- 1
- Kitchen
- Pantry kitchen
- Location
- Al Awir, Dubai
- Category
- Majlis
- Year / status
- Design stage
About this project
Heritage majlis of 54 m² (11 x 4.9 m) with a sandy facade and mashrabiya panels, plus a bathroom, washbasins, a prep kitchen and a dining area. The project posts show the design.
Project photos
3D design
Facilities
- Majlis
- Dining room
- Wash basins
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Majlis13Majlis – Al Dhaid, Sharjah — 55 m²Al Dhaid, SharjahSome details not specified
Majlis5Majlis with bathroom and prep kitchen – Al Mankhool, Dubai — 36 m²Al Mankhool, DubaiSome details not specified
Majlis24Outdoor majlis – Al Juraina, Sharjah — 132 m²Al Juraina, SharjahSome details not specified







