Design: annex or rest house, 1 bedroom – Al Bada’a, Dubai — 95 m²
Annex or rest house design of 95 m² with a master bedroom, majlis, bathroom, prep kitchen and outdoor areas in Al Bada'a, Dubai. 3D render and plan.

Key facts
- Area
- 95 m²
- Bedrooms
- 1
- Bathrooms
- 1
- Kitchen
- Pantry kitchen
- Location
- Al Bada'a, Dubai
- Category
- Annex
- Year / status
- Design stage
About this project
A 95 m² annex or rest house with a master bedroom, a spacious majlis, a bathroom with washbasins, a prep kitchen and outdoor areas, according to the project post. The single image combines a 3D front render, showing a symmetrical facade with planting and steps, and a plan view of the majlis, corridor and bedroom with the landscaped surroundings.
Project photos
3D design
Facilities
- Majlis
- Wash basins
- Master bedroom
- Prep kitchen
- Outdoor areas and landscaping
See it on Instagram
Planning something similar?
Send us this project and we will reply with a visit and an estimate.
Estimate in the app
Similar projects
Annex4Modern villa annex, 2 bedrooms – Al Mizhar 1, Dubai — 130–135 m²Al Mizhar 1, DubaiMBRHE fundedSome details not specified
Annex24Villa annex, 3 bedrooms – Al Barsha 3, Dubai — 115 m²Al Barsha 3, DubaiMBRHE fundedSome details not specified
Annex27Annex with 2 bedrooms, hall and kitchen – Al Quoz, Dubai — 110 m²Al Quoz, DubaiMBRHE fundedSome details not specified





