Free construction calculators for villa, annex and building work in Dubai and the UAE. Each tool starts from what you measure on site, such as the length and height of a wall, and gives you what to order: whole blocks and bags of cement, tonnes of sand, litres of paint, boxes of tiles, steel bars, cables and tank sizes. Every page has one-tap real-life examples (a boundary wall, an annex slab, a majlis floor) so you can see how it works before you enter your own sizes.
Structure and concrete
- Concrete Calculator (m3) with Ready-Mix TrucksConcrete volume for footings, columns, beams and slabs, plus truck count and formwork area.
- Concrete Mix Ratio Calculator (Cement, Sand, Aggregate)Cement bags, sand, aggregate and water for common mixes and grades.
- Steel Weight Calculator (Rebar) and Bar Bending ScheduleSteel weight by bar size, stock bars of 12 m, laps and waste.
- Rebar Cutting Optimizer (Steel Bar Cutting Plan)Cutting plan from 12 m bars: bars to order, what to cut from each, waste and steel weight.
- Rebar Equivalent Calculator (Bar Area Conversion)Replace bars with another size by steel area, bar area table and spacing to area per metre.
- Slab Calculator (Concrete, Steel, Formwork and Hourdi)Concrete, ready-mix trucks, steel, formwork and hollow blocks for solid and hourdi slabs.
Masonry and finishes
- Block Calculator (Concrete Blocks)Number of blocks, mortar, cement bags and sand for a wall, with openings deducted.
- Block Wall Calculator (Blocks, Cement, Sand, Plaster, Paint)Enter wall length and height: blocks, cement bags and sand for mortar and plaster, and paint litres.
- Plaster CalculatorCement and sand for internal and external plaster by thickness.
- Cement and Sand Calculator: Screed and MortarCement bags and sand for a floor screed or a mortar mix, or what your bags will cover.
- Paint CalculatorLitres of paint and primer from wall areas, openings and coats.
- Tile CalculatorTiles, boxes, adhesive, grout and skirting for floors and walls.
- Room Tile and Paint Calculator (Finishing Quantities)Floor tiles, adhesive, grout, skirting, wall paint and gypsum ceiling boards for one room.
- Gypsum Board Calculator (Ceilings and Partitions)Boards, channels, studs, hangers, screws, tape and compound for false ceilings and partitions.
- Waterproofing Calculator: Rolls, Primer and ScreedMembrane rolls or kg, primer and protection screed for a roof, bathroom or basement.
Earthworks and site
- Excavation and Backfill Calculator (m3 and Truck Loads)Soil to dig, backfill, surplus soil and truck loads for footings, trenches and plots.
- Formwork Calculator (Shuttering Area, Plywood and Props)Shuttering area, plywood sheets and props for footings, columns, beams, slabs and walls.
- Interlock Paving Calculator (Pavers, Sand, Kerbs)Pavers, bedding and joint sand, compacted base and kerbs for a driveway, yard or path.
Electrical, cooling, energy and water
- Cable Size Calculator (Preliminary)A preliminary copper cable size from load, length and voltage drop.
- Villa Electrical Load CalculatorConnected load, estimated maximum demand and a DEWA supply band from lights, sockets, AC and appliances.
- Solar Panel Calculator (Shams Dubai)System size in kWp, panels, roof area and yearly generation from your DEWA consumption.
- AC Size Calculator (BTU and Tons)An estimate of cooling load in BTU/h and tons for a room.
- Water Tank Capacity CalculatorTank size in litres and gallons from occupants, daily use and storage days.
Planning
- Area Calculator (Plot, Room, Built-Up)Plot, room and built-up area in m2 and ft2, with plot coverage percentage.
- Stair Calculator (Risers, Treads, Concrete)Risers and treads from floor height and run, checked against DBC limits, with stair concrete and formwork.
- Annex BOQ Quantity Estimate (Concrete, Steel, Blocks)Concrete, steel, blocks, cement, sand, tiles and paint for a villa annex from its size, floors and rooms.
What these calculators do
Every calculator works out quantities from the sizes you enter, shows the formula it used, and lets you print the result or copy a link to share it with your engineer, supplier or contractor. They are planning tools: the approved drawings and your engineer always govern the final quantities.
We are a Dubai contractor for villa annexes, majlis, rest houses and buildings, and we built these tools from the questions owners ask us on site.
Quantities here, costs in the app
These pages give quantities only, never prices. If you want the full cost of an annex, our mobile app brings the quantities together with finish levels and gives an indicative cost. Read how it works in the app guide.
Frequently asked questions
Are the calculators free?
Yes. They are free to use, with no sign-up. Print the result or copy it to send to your team.
Do the calculators give prices?
No. They give quantities only. For the cost of the whole annex, use the cost calculator in our app.
Which units do the calculators use?
Metric units: metres, millimetres, square and cubic metres, kilograms and litres, as used on UAE drawings.
Can I rely on the results for ordering materials?
Treat them as a planning estimate. Check the quantities against the approved drawings and your engineer before ordering.