Block Calculator: Blocks, Mortar and Cement Bags

Use this block calculator to work out how many concrete blocks a wall needs, with doors and windows deducted, plus the mortar, cement bags and sand for the joints. It works for the common 400 × 200 mm block in 100, 150 and 200 mm thickness, hollow or solid (called طابوق, بلوك or طوب in Arabic, and بلوك باطون in the Gulf). If your walls have different thicknesses, such as 200 mm outside and 100 mm partitions, run each thickness separately and add the totals. If your 400 × 200 block is the nominal size that already includes the joint, choose 390 × 190. It gives quantities only, in metric units, set up for villa, annex and boundary wall work in Dubai and the UAE.

How the block calculator works

Each block takes up its face size plus one mortar joint on the bed and on the end, so the number of blocks per square metre of wall is:

  • Blocks per m² = 1 ÷ ((block length + joint) × (block height + joint)), with all sizes in metres. For a 400 × 200 mm block and a 10 mm joint that is 1 ÷ (0.41 × 0.21) = 11.61 blocks per m².
  • Net wall area = the sum of wall length × height, minus the sum of door and window width × height.
  • Blocks to order = net area × blocks per m² × (1 + breakage allowance), rounded up. The default allowance is 5 percent.

The mortar is worked out from the joint volume:

  • Mortar per m² of wall (full bedding) = block thickness − blocks per m² × block length × block height × block thickness.
  • Bedding factor: solid blocks are taken as bedded over the full joint area (1.0). Hollow blocks are taken as bedded on the face shells and part of the webs, which is assumed to be 80 percent of the full area. This 80 percent is an assumption, not a standard value: choose solid or raise the mortar waste if your masons bed the full width.
  • Wet mortar = net area × mortar per m² × bedding factor × (1 + mortar waste). The default mortar waste is 25 percent for droppings and spillage.
  • Dry volume = wet mortar × 1.33. Cement and sand shrink when they are wetted and mixed, so the dry materials take about a third more volume than the finished mortar (typical values are 1.25 to 1.35).
  • Cement = dry volume ÷ (1 + sand parts) × 1,440 kg/m³, divided by 50 kg per bag and rounded up. The mix is cement : sand by volume (1 : 4 by default).
  • Sand = dry volume × sand parts ÷ (1 + sand parts). The tonnes shown use about 1,600 kg/m³ for loose sand (typical range 1,500 to 1,700).

Lintels, bond beams, filled cores, reinforcement and plaster are not included. For plaster use the plaster calculator.

Worked example

A wall 10 m long and 3 m high with one door of 1.0 × 2.1 m and two windows of 1.5 × 1.2 m, built with 400 × 200 × 200 mm hollow blocks, a 10 mm joint, 5 percent breakage, mortar 1 : 4 and 25 percent mortar waste.

  • Wall area 10 × 3 = 30.00 m². Openings 2.10 + 2 × 1.80 = 5.70 m². Net area 24.30 m².
  • Blocks: 24.30 × 11.614 = 282.2, so 283 blocks. With 5 percent: 296.4, so 297 blocks to order.
  • Full-bedding mortar: 0.2 − 11.614 × 0.4 × 0.2 × 0.2 = 0.01417 m³ per m². The hollow factor 0.8 gives 0.01134 m³ per m².
  • Wet mortar: 24.30 × 0.01134 × 1.25 = 0.344 m³. Dry volume: 0.344 × 1.33 = 0.458 m³.
  • Cement: 0.458 ÷ 5 = 0.0916 m³ × 1,440 = 131.9 kg, which is 2.64, so 3 bags of 50 kg.
  • Sand: 0.458 × 4 ÷ 5 = 0.366 m³ (about 0.59 tonnes).

Notes for Dubai and the UAE

  • In the UAE, concrete blocks (طابوق, also called block, بلوك or طوب) are commonly made 400 × 200 mm on the face in thicknesses of 100, 150 and 200 mm (4, 6 and 8 inch). Many suppliers quote 400 × 200 mm as the nominal size including the joint, which is an actual 390 × 190 mm block: if that is your block, choose 390 × 190 (12.5 per m²). Lightweight and AAC blocks come in other sizes and are laid with thin-bed adhesive, so the mortar quantities here do not apply to them. Check the size with your supplier and the project specification, and use the other-size option if needed.
  • The block type, strength class and the mortar mix are set in the approved drawings and specification. The calculator's 1 : 4 mix is a common default, not a requirement.
  • External and boundary walls are usually 200 mm, internal partitions 100 or 150 mm. Check the drawings for each wall.
  • Blocks are normally ordered per piece and delivered by the truck. Order a little over the calculated number for breakage, and keep the blocks off the ground and covered on site.
  • In hot weather mortar dries fast. Wet the blocks and keep fresh walls damp as the consultant instructs.

This tool counts blocks and mortar only. For the cost of the whole annex, use the calculator in our app.

Frequently asked questions

How many blocks per square metre?

A 400 × 200 mm block with a 10 mm joint needs about 11.6 blocks per m² of wall, whatever the thickness (100, 150 or 200 mm). Blocks of 390 × 190 mm with the same joint need 12.5 per m². If your 400 × 200 block is the nominal size including the joint, choose 390 × 190.

How do I calculate the number of blocks for a wall?

Multiply the wall length by its height, subtract the doors and windows, and multiply the net area by the blocks per m². Add 3 to 10 percent for breakage and round up. The calculator does this for several walls at once.

How much cement and sand do I need for block mortar?

It depends on the block thickness, the joints and how the mortar is laid. For the default wall above the calculator gives 3 bags of 50 kg of cement and about 0.37 m³ of sand. Change the mix, joint, block type and mortar waste to match your site. For walls of different thicknesses, calculate each thickness separately and add the totals.

Are طابوق, بلوك and طوب the same thing?

In the Gulf these words are used for the same concrete masonry units used to build walls. When you order, go by the size in millimetres rather than the name.

Does the calculator include plaster, lintels or reinforcement?

No. It counts blocks and joint mortar only. Plaster has its own calculator, and the lintels, columns and reinforcement come from the structural drawings.

Is the result exact?

It is a planning estimate based on the sizes you enter. The approved drawings and your engineer always govern the final quantities.