Skip to content

Annex and majlis projects in Al Twar, Dubai

Majlis - Al Twar, Dubai — 62 m² - 3D design

Al Twar is a residential area in north-east Dubai, next to Al Qusais. This page gathers the villa annex, majlis and rest house projects Al Mustafa has designed or built in Al Twar, Dubai, with the key facts of each, what owners here usually build, and the services and guides to read before you plan your own.

In short

  • 3 projects in Al Twar: 1 annex, 2 majlis designs; 0 completed and 3 at design stage.
  • Areas range from 62 to 104 m2 where an area is quoted.
  • Permit drawings are prepared through a Dubai Municipality registered consultant or engineering office, and the contractor builds from the approved drawings.

Projects in Al Twar

majlis, Al Twar, Dubai - 62 m²

majlis, Al Twar, Dubai - 62 m²

Majlis, 62 m2, 1 bathroom, design project.

villa annex, 2 bedrooms, Al Twar, Dubai - 104 m²

villa annex, 2 bedrooms, Al Twar, Dubai - 104 m²

Villa annex, 104 m2, 2 bedrooms, 2 bathrooms, prep kitchen, design project.

majlis, Al Twar, Dubai

majlis, Al Twar, Dubai

Majlis, 1 bathroom, design project.

What owners in Al Twar usually build

Our Al Twar designs pair hospitality with practical service space: a 62 m2 majlis with a bathroom and washbasins, a majlis designed with outdoor seating and a pool, and a two-bedroom annex of 104 m2 with a prep kitchen and a laundry. The pattern is a household that wants a place to host and a place for relatives to stay on the same plot.

Practical checks for a plot in Al Twar

  • Electricity: a new annex or majlis usually needs DEWA to review the load and the connection; see the DEWA connection guide.
  • Funding: if you plan to use a housing grant or loan, read the funding guide before you fix the design, because the approved scope matters.
  • Existing buildings: if part of the plot already has an unlicensed addition, see how to license an existing annex first.
  • Drawings and site: bring your plot documents and photos of the site and the villa to the first meeting so the first layout is realistic.

Planning your own project in Al Twar

  1. Define the need. Guest annex, family hall, majlis for hosting, or a mix. The annex cost guide explains what drives the budget without quoting prices.
  2. Design. See our annex design service, villa design service and majlis design ideas.
  3. Permit. Read the building permit guide. Permit procedures in some areas, such as master-developer communities, follow other authorities, so confirm which authority issues the permit for your plot.
  4. Build. Choose a contractor registered with Dubai Municipality and working within its class, as explained in approved contractors and materials. Our annex construction service and villa construction service cover execution.

To see every project we have published, visit our projects, or contact us to arrange a site visit in Al Twar.

Scroll to Top