An annex construction contractor in Dubai should take you from an idea for extra space to a licensed, inspected and finished building, with one clear scope and one team answering for the work. Al Mustafa Contracting builds villa annexes, external majlis, rest houses, service blocks, maid rooms and kitchens in Dubai. This page explains what we build, how a project runs from the first site visit to the completion certificate, and how to compare annex contractors before you sign.
In short
- We build annexes, majlis, rest houses (istiraha), service blocks, maid rooms and kitchens on villa plots in Dubai, and every job starts with a site visit so the scope is clear before work begins.
- Permit drawings are prepared and submitted through a Dubai Municipality-registered engineering consultant, while we carry out the building works. We work alongside the consultant you appoint, or help you find the right one.
- Dubai Municipality (DM) inspects before foundations and before a concrete roof slab is poured, and a completion certificate closes the project.
- The scope, stages and payment schedule are written in a contract. Pricing depends on the plot, design and finish, so we quote after the site visit. Our annex cost guide explains what drives the price.
- Building with Mohammed bin Rashid Housing Establishment (MBRHE) support? Read our MBRHE annex and majlis guide.
Annex construction contractor in Dubai: what we build
Al Mustafa Contracting is the trading name of Mustafa & Ibrahim Technical Services LLC, a Dubai company focused on small and mid-size villa projects. For annexes our work covers:
- Villa annexes: bedrooms, a living hall, a prep kitchen and bathrooms, from a one-bedroom annex to a three-bedroom annex with a family hall.
- Majlis: external majlis and a majlis with a bathroom and prep kitchen. See our external majlis design ideas if you are still deciding.
- Rest houses: modern rest houses with outdoor seating, and a pool if you want one.
- Service blocks, maid rooms and kitchens: practical rooms that serve the main villa, built as part of an annex or on their own where the plot rules allow.
- Prefab and ready buildings for small uses. See prefab annexes in Dubai.

How an annex project runs: from site visit to completion certificate
- Site visit and brief. We inspect the plot and the available area, listen to what the family needs and the intended use, and write the scope down.
- Design and 3D views. You review the plan and see the expected result before construction begins. Drawings are prepared through a licensed engineering office or designer.
- Permit. The permit request is submitted electronically in Dubai BPS by the registered engineering consultant, and DM shows the official fees when the request is made. We follow the request with you. Our annex permit guide explains the steps.
- Construction in stages. Works start only after the permit: foundations, then structure, then services, then finishing. The DM engineer inspects the site before foundations are poured and before a concrete roof slab is poured, and pouring waits for approval.
- Completion and handover. The completion certificate follows DM's check that the works match the permit and the approved drawings. We review the finished work with you. See inspections and the completion certificate.
The consultant and the contractor: who does what
Dubai separates the design and permit side from the building side, and it works well when both do their part. A DM-registered engineering consultant prepares and submits the permit drawings. The contractor builds to those approved drawings and follows the instructions of the office the owner appoints. Whether a supervising consultant is needed during construction depends on your permit, and your Dubai BPS request shows what it requires. We respect the consultant's role and coordinate with the office throughout, and the required DM inspections apply at their stages.
If you already have a building without a permit, the route is different. Read how to license an existing annex in Dubai, and ask us for a site visit to look at it with you.

Building system and roof: concrete or sandwich panel
| Option | What to know | Where to read more |
|---|---|---|
| Block and concrete | A concrete roof slab is inspected by DM before it is poured | Block, sandwich panel or cement board |
| Sandwich-panel roof | Lightweight; no concrete slab to pour, so there is no slab pre-pour check. DM's structure and completion inspections still apply, as your Dubai BPS request shows. Our sandwich-panel roofs carry a 10-year roof warranty and a heat-insulation guarantee, as stated on our About page | Sandwich-panel roof annex |
| Prefab | Suits small uses and faster delivery, subject to the permit conditions | Prefab annexes |
Written contract and staged payments
DM's Circular 13-5-1 on guidance contracts for villa projects asks for a written building contract between owner and contractor before construction. It lists the minimum clauses: parties, description of the works, order of precedence of documents, responsibilities, contract value, variation orders agreed before execution, duration and programme, payment mechanism for all stages, delay, termination, document ownership, notices and disputes. We write the scope, the stages and what the work includes and excludes, and tie payments to stages of work. Before you sign with anyone, our 12-point annex contractor checklist is a useful read.
Annexes with MBRHE support
Many of our clients build with MBRHE support, through either the grant or the loan, and others build with their own funds. Conditions, amounts and payment mechanics are set by MBRHE alone, so please confirm them with MBRHE directly; our MBRHE annex and majlis building guide explains the building side, and grant, loan or bank finance compares the options.
Why choose Al Mustafa Contracting
- Clarity before contracting. We explain the scope, the stages and what is included and excluded, so you know what you are paying for.
- Honest opinions. If a request does not suit the plot, the area or the requirements, we say so and suggest an alternative.
- Inspections tied to stages. Foundations and a concrete roof slab are not poured until the DM engineer has inspected and approved.
- Dubai projects you can see. Handed-over projects include Al Mizhar, Al Barsha, Al Quoz, Nad Al Hamar, Al Khawaneej, Mirdif and Al Mankhool. Browse our projects and judge the finish yourself.
- Direct contact. You reach us by WhatsApp or phone and can ask about your project whenever you wish.

How to compare annex contractors in Dubai
- Give every contractor the same drawings and scope.
- Ask for a bill of quantities with quantities, not one lump sum.
- Clarify who supplies materials and which items are allowances.
- Ask for the current trade licence and DM registration. Law 7 of 2025 requires them, and our guide to approved contractors and materials shows how to check.
- Tie payments to stages of work, as agreed in the contract.
- Ask how variations are priced before they are carried out.
Our free annex construction calculator app helps you estimate quantities from your own specifications before you call us. Planning a taller building instead? See our low-rise building construction page, or our villa construction company page for a full villa.
Frequently asked questions
How do I start with an annex construction contractor in Dubai?
Send us the project location and area, what you want to build, and photos of the site by WhatsApp or the contact page. We review them, arrange a site visit, and prepare the design and quotation based on what we agreed.
Who submits the permit to Dubai Municipality?
A Dubai Municipality-registered engineering consultant prepares and submits the permit drawings electronically in Dubai BPS. We follow the request with you and build to the approved drawings.
Which inspections does Dubai Municipality carry out?
The DM engineer inspects before foundations are poured and before a concrete roof slab is poured, and pouring waits for approval. A sandwich-panel roof has no concrete slab to pour, so there is no slab pre-pour check, but DM's structure and completion inspections still apply, as your Dubai BPS request shows. A completion certificate follows the final check.
Can you build a majlis, a rest house or a maid room, not only an annex?
Yes. We build majlis, rest houses, service blocks, maid rooms and kitchens, subject to what the plot and the permit allow. We confirm this at the site visit.
Can I build an annex with MBRHE support?
Many of our clients do. Eligibility and conditions are set by MBRHE, so confirm them directly with MBRHE, and see our MBRHE guide for the build side.
How much does an annex cost?
We do not publish prices, because the cost depends on the plot, the design, the finishes and the construction method. We clarify the scope after the site visit, and our annex cost guide lists the factors.
Talk to us about your annex
We are happy to look at your plot and explain the path. Message us on WhatsApp, use the contact page, or browse our projects first. More about the company is on the About page, and all our work is listed on the services page.
This page summarises official Dubai Municipality documents for owners and is not legal advice. The official DM website and the current versions of the documents prevail.
Official sources
- Law No. (7) of 2025 on regulating contracting activities in the Emirate of Dubai
- Circular 13-5-1 (2023): guidance contracts for engineering consultancy and building contracting for villa projects
- Circular 13-3-1 (2021): developing building licensing procedures and requirements for practising design and execution, Circular 3-10-1 (2021): steps of building licensing and Circular 3-10-2 (2022): launching the unified window for building licensing
- Administrative Decision No. (275) of 2024 approving the procedures for changing engineering offices and contracting companies and issuing completion certificates