14 min read
In this article
- In short
- Building violations in Dubai: what counts as a violation
- Common situations that become violations
- Fines for building violations in Dubai: what the documents say
- Who carries responsibility on site
- Dilapidated, abandoned and unlicensed buildings: Administrative Decision 61 of 2011
- Dilapidated or abandoned buildings
- Unlicensed buildings in Dubai: the existing building certificate
- Official fees in the decision
- The path to regularise
- How to avoid building violations in Dubai from day one
- Frequently asked questions
- What is the fine for illegal construction in Dubai, and for building without a permit?
- What is an unlicensed annex in Dubai, and can it be regularised?
- Can DM demolish a building?
- Who is responsible for a violation, the owner or the contractor?
- Do I need a consultant to avoid violations on a small annex?
- Is building without a permit in Dubai a violation even for a small annex or majlis?
- Where can I find the Dubai Municipality building violations table?
- Does this apply in free zones?
- Official sources
- Planning a licensed annex or majlis?
Building without a permit is one of the building violations in Dubai, and the Dubai Municipality (DM) documents set out clearly what that means: which works count as violating, the fine ceiling in the building works order, what DM can do about a dilapidated or abandoned building, and how an unlicensed building can be regularised. This guide explains the rules for villa owners planning an annex, majlis or extension, and shows the practical way to stay on the right side of them.
In short
- Under Local Order No. (3) of 1999, no building work, permanent or temporary, may start without the licence from the competent department. Works without a licence, works that differ from the licence, and works that break approved engineering practice all count as building violations in Dubai.
- The fine for a violation is capped at AED 50,000 and is doubled if a violation is repeated. DM can also cut services to the building and, for repeat violations, stop new licences or suspend an engineer's or contractor's licence.
- Administrative Decision No. (61) of 2011 covers unlicensed, dilapidated and abandoned buildings, and sets out an "existing building certificate" route, written for buildings that developers completed before 2011 without DM licensing. It looks for a safe structure, conforming drawings and an approved consultancy's report.
- A DM violations table sets the amount for each violation; it is a separate decision and we do not quote amounts from it. Fees and fine amounts are shown by DM when you apply or are notified.
- The easiest way to avoid all of this is a licence before the first block is laid, plus the DM inspections at the foundation and roof stages.

Building violations in Dubai: what counts as a violation
Local Order No. (3) of 1999 on regulating building works in the Emirate of Dubai defines "violating building works" in three ways: works not licensed under the order, works that depart from the licence that was issued, and works that go against the approved engineering and professional standards. The order applies to existing public and private buildings as well as new ones.
The core rule is simple. Nobody may carry out building works, in whole or in part, permanent or temporary, or change the features of a plot or property, until the licence has been issued by the competent department. An annex, a majlis, a rest house or a new floor all fall under this.
Common situations that become violations
- No licence at all: starting an annex or extension on the basis of a verbal understanding or a neighbour's experience.
- Building differently from the approved drawings: the order requires works to follow the approved drawings and conditions, and no change to the approved documents without DM approval.
- Unapproved materials: materials must match the standards approved by DM.
- Occupying before the completion certificate: the order does not allow a finished building to be occupied before the DM inspector checks it against the licence and a completion certificate is issued. Water and electricity are not to be connected without DM approval.
- A licence that lapses: the Director General may cancel a licence if works do not start within three months of issue or stop for more than three consecutive months.
Fines for building violations in Dubai: what the documents say
Article 28 of the same order lists the consequences for a violator, including the fine for building without a permit. One or more may apply, without prejudice to any harsher penalty in another law:
- A fine not exceeding AED 50,000, doubled when a violation is repeated.
- Cutting all services to the building or site for a period set by the department.
- For repeat violations: stopping new licences or renewals for the violator.
- For repeat violations: suspending the commercial or professional licence of the engineer or contractor, temporarily or permanently.


The order leaves the list of violating acts and the penalty for each to an executive regulation. A later DM decision (Administrative Decision No. (350) of 2022) refers to a table of violations and penalties approved under Administrative Decision No. (425) of 2016, but that table is not part of the documents we studied, so we do not quote a per-violation amount. DM inspectors have the capacity of judicial-police officers and may enter building sites and the common parts of existing buildings to inspect and record violations.
Who carries responsibility on site
The order makes the contractor and the engineer jointly liable for the works and their safety. A contractor is responsible for violating acts on site from taking over the site until the contract ends, unless he stops the work and notifies the department. This is one reason a professional contractor will pause and tell you if a requested change is not permitted. It protects your licence and your investment, and it is a sign you have a real partner. See our 12-point agreement checklist.
Law No. (7) of 2025 on contracting activities in Dubai and Law No. (14) of 2025 on engineering consultancy also set fines for breaches of those laws (from AED 1,000 up to AED 100,000, doubled on repeat within a year, with a ceiling of AED 200,000). They regulate the contracting and engineering consultancy professions, so they matter mainly to firms. Check the effective dates and any executive decisions on the DM website.
Dilapidated, abandoned and unlicensed buildings: Administrative Decision 61 of 2011
Administrative Decision No. (61) of 2011, amended by Administrative Decision No. (162) of 2011, covers three kinds of building in Dubai: unlicensed, dilapidated and abandoned.
Dilapidated or abandoned buildings
On a technical report from a committee, the Buildings Department may decide to demolish, remove or restore a building if the committee finds that it is:
- dilapidated, cracked or collapsing, or built without a licence, in a way that endangers occupants, passers-by, neighbours or public safety; or
- abandoned, either vacant or never completed, in a way that spoils the general appearance of Dubai or creates a health nuisance or security risk.
The owner is notified and given a period of no more than six months to demolish, remove, restore or complete the building. If the owner does not act, DM carries out the work, and the owner pays all demolition, removal or restoration costs plus administrative expenses, which Decision 162 of 2011 set at 20% of those costs (down from 25%). The decision also refers to a financial guarantee under the older building insurance decision (Administrative Decision No. (27) of 2001). In 2022 DM stopped collecting building insurances under that decision (Administrative Decision No. (350) of 2022), so confirm with DM whether a guarantee applies to you.
Unlicensed buildings in Dubai: the existing building certificate
The decision lets the Buildings Department issue an "existing building certificate" instead of a completion certificate, and a "building permit" instead of a licence for a building still under construction. For buildings that some real-estate developers completed before the decision came into force without DM licensing, supervision or control, Article 3 sets these conditions:
- The structural condition is acceptable technically and is not a danger to public safety.
- The drawings and designs conform to engineering and professional standards.
- The owner submits a technical report from an approved engineering consultancy confirming the building is fit for occupancy, together with a declaration from the contractor and the consultant engineer that the execution followed the drawings and the accepted technical specifications.

Article 3 is written about developers' buildings, and the one-year period given to developers in Article 4 has long passed. We cite it because it shows the kind of checks DM makes on an unlicensed building: structure, drawings and an engineer's report. The decision does not set a separate route for a single owner's annex. For an unlicensed annex in Dubai of your own, use the step-by-step guide to licensing an existing unlicensed annex or building.
Official fees in the decision
For the certificate or permit under Article 3, Article 5 states the allowance for the site inspection: AED 1 per square foot of building area, not less than AED 1,000 and not more than AED 50,000 per building. On top of this come the licensing fees under Local Order No. (3) of 1999, and amendment fees if the building departs from an approved planning or building determinant. These are the figures as printed in the 2011 decision; DM sets the current fees and shows them when you apply.
The path to regularise
For a small project such as an annex or majlis, a supervising consultant is not mandatory during execution, but a consultant or engineering office may be involved at the design and permit stage. When you regularise an existing building, the decision above (Article 3) does ask for a report from an approved engineering consultancy, so plan for an engineering office at that point. The two cases are different, and DM's rule for the case you are in applies.
Some areas of Dubai follow other licensing authorities, for example where a different entity is the competent authority under its own legislation. The Dubai Building Code applies across the Emirate, but confirm who issues the licence for your plot before you start.

How to avoid building violations in Dubai from day one
- Licence first: building without a permit is the most direct route to a violation, so start only after the licence is in hand. See building permit for a villa annex in Dubai.
- Follow the Dubai Building Code: it is binding for building designs licensed after it came into force (Decree No. 45 of 2021). See the Dubai Building Code guide for annexes.
- Do not skip the inspections: the DM engineer inspects before the foundations are poured and pouring waits for approval, and the same applies before a concrete roof slab is poured. A sandwich-panel roof has no pour, so the slab inspection does not apply to it. Details in DM inspections and the completion certificate.
- Agree changes in writing: any change to the approved drawings needs approval before it is built.
- Use approved materials and a licensed contractor: see approved materials and contractors and site safety for villa works.
- Do not occupy early: wait for the completion certificate before moving in, and connect water, electricity and other services only with DM approval.
Frequently asked questions
What is the fine for illegal construction in Dubai, and for building without a permit?
Local Order No. (3) of 1999 sets a ceiling of AED 50,000 for a violation, doubled on repeat, and allows services to be cut. The amount for each violation comes from a DM table, and DM shows it in the notice or when you apply.
What is an unlicensed annex in Dubai, and can it be regularised?
It is an annex built without the licence, or built differently from it. DM's documents describe the checks it applies to an unlicensed building (structure, drawings and an approved consultancy's report), though not a separate route for a single annex; read our guide to licensing an existing annex, then ask DM about your case.
Can DM demolish a building?
Under Decision 61 of 2011, the Buildings Department can order demolition, removal or restoration of a dilapidated, abandoned or unsafe unlicensed building, after a committee report and a notice with up to six months to act.
Who is responsible for a violation, the owner or the contractor?
The order makes the contractor and engineer jointly responsible for the works. A contractor is responsible for violating acts on site unless he stops the work and notifies DM. The licence is in the owner's name, so agree the scope and changes in writing with your contractor.
Do I need a consultant to avoid violations on a small annex?
In small projects such as an annex or majlis, a supervising consultant is not mandatory during execution, but a consultant or engineering office may take part at the design and permit stage. Regularising an existing building under Decision 61 is different and calls for an approved consultancy's report.
Is building without a permit in Dubai a violation even for a small annex or majlis?
Yes. The order says nobody may carry out building works, in whole or in part, permanent or temporary, until the licence has been issued, and an annex, a majlis, a rest house or a new floor all fall under this.
Where can I find the Dubai Municipality building violations table?
The amount for each violation comes from a DM table approved under Administrative Decision No. (425) of 2016. It is a separate decision that is not part of the documents we studied, so we do not quote it. DM shows the amount in the notice or when you apply.
Does this apply in free zones?
The Dubai Building Code applies across the Emirate, including free zones, but licensing is done by the competent authority for each area. Confirm yours before you start.
Official sources
- Local Order No. (3) of 1999 on regulating building works in the Emirate of Dubai
- Administrative Decision No. (61) of 2011 on unlicensed, dilapidated and abandoned buildings in the Emirate of Dubai
- Administrative Decision No. (162) of 2011 amending Decision No. (61) of 2011
- Decree No. (45) of 2021 on the Dubai Building Code
- Law No. (7) of 2025 regulating contracting activities in the Emirate of Dubai
- Law No. (14) of 2025 regulating engineering consultancy activities
- Administrative Decision No. (350) of 2022 stopping collection of insurances under Administrative Decision No. (27) of 2001
This article summarises official Dubai Municipality documents for owners. It is not legal advice; the official DM website and the current versions of the documents prevail.
Planning a licensed annex or majlis?
If you would like to start the right way, send us your plot details on WhatsApp or through the contact page, and we will explain the licensing and inspection steps for your case. You can also try the free cost calculator, see our services or browse our projects.
Planning your next project?
Talk to the Al Mustafa team for advice and a quotation for your project in the UAE.