Use this excavation calculator to work out how much soil you dig for footing pits, strip footing trenches, a full-area dig or a service trench, how much backfill goes back, and how many truck loads of surplus soil leave the site. Enter the footings as you would mark them out on site, then set the working space, the side slope and the type of ground. The calculator applies the swell of dug soil and the shrinkage of compacted fill, so you get the volume in place, the loose volume the trucks carry, the backfill, and the fill you may need to bring in. It gives quantities only, in metric units, for villa, annex and boundary wall work in Dubai and the UAE (excavation and backfill is called حفر وردم in Arabic).
How the excavation calculator works
All sizes are in metres. The pit is measured at the bottom, which is the footing size plus the working space on every side, and widens upwards by the side slope.
- Footing pit or full-area dig: bottom size a × b = (length + 2 × working space) × (width + 2 × working space), depth D, side slope z (horizontal run per 1 m of depth). Volume = a·b·D + z·D²·(a + b) + 4/3·z²·D³. This is the exact volume of a pit with sloped sides (the prismoid formula) and it equals a·b·D when the sides are vertical.
- Strip footing trench: length × depth × (footing width + 2 × working space + z × depth). Corner and end effects are ignored.
- Service trench: length × width × depth, vertical sides, no working space (the width you enter is the dug width).
- Structure left in the ground: footing plan area × footing thickness (never more than the depth), plus the "other structure" volume you enter for neck columns, ground beams and plinth walls.
- Backfill (compacted) = soil to dig − structure left in the ground. It is the hole that must be filled again.
- Swell: dug soil takes more room than it did in the ground. Loose volume = volume in place × (1 + swell). Truck loads are counted on the loose volume.
- Compaction shrinkage: compacted fill is denser than the ground it came from, so filling 1 m³ of compacted backfill needs 1 ÷ (1 − shrinkage) m³ of soil in place.
- Reuse on: the dug soil goes back as backfill. Surplus = soil dug − soil needed (if positive, it is taken away) and fill to import = soil needed − soil dug (if positive). Reuse off: all the dug soil is taken away and all the backfill is brought in.
- Truck loads = loose volume ÷ truck size, rounded up. The default truck is 10 m³, change it to your hauler's tipper.
The swell and shrinkage values are typical planning figures, not site measurements: sand 12 and 5 percent, silty sand or common soil 20 and 10, stiff clay 35 and 15, broken weak rock 45 and 0. Published earthmoving ranges are roughly 5 to 15 percent swell for sand and gravel, 20 to 30 for common soil, 30 to 45 for clay and 40 to 60 for rock. Choose your own factors if your soil report or hauler gives them. Side slopes are your choice: for reference, OSHA 29 CFR 1926 Subpart P Appendix B allows 1.5 horizontal to 1 vertical in granular (type C) soil and 1 to 1 or steeper in firmer soil. The consultant and the geotechnical report decide for your site.
Worked example: annex footings
A villa annex has 12 isolated footings of 1.5 × 1.5 m, 0.5 m thick, dug 1.2 m deep. The working space is 0.3 m, the sides slope 1 horizontal to 2 vertical, the ground is silty sand (swell 20 percent, shrinkage 10 percent), and the necks and ground beams below ground add 0.8 m³ of concrete.
- Bottom of each pit: 1.5 + 2 × 0.3 = 2.1 m square. Volume per pit = 2.1 × 2.1 × 1.2 + 0.5 × 1.2² × (2.1 + 2.1) + 4/3 × 0.5² × 1.2³ = 5.292 + 3.024 + 0.576 = 8.892 m³. For 12 pits: 106.7 m³ of soil in place.
- Loose after digging: 106.7 × 1.20 = 128.0 m³.
- Footing concrete: 12 × 1.5 × 1.5 × 0.5 = 13.5 m³, plus 0.8 m³ for the necks, so 14.3 m³ stays in the ground.
- Backfill: 106.7 − 14.3 = 92.4 m³ compacted. Soil in place needed: 92.4 ÷ 0.90 = 102.7 m³.
- Surplus: 106.7 − 102.7 = 4.0 m³ in place, which is 4.8 m³ loose: 1 truck load of 10 m³. Nothing needs to be imported.
The lesson on site: most of the soil goes back into the pits, so ordering trucks for the whole 128 m³ would be a waste. Two more real cases are loaded by the "Try an example" buttons. A boundary wall footing of 60 m (0.6 m wide, 0.8 m deep, 0.3 m working space each side, vertical sides, sand, 4.8 m³ of block plinth below ground) digs 57.6 m³, needs 38.4 m³ of backfill and sends 2 loads away. A majlis of 6 × 8 m dug 0.6 m deep down to the slab level (0.4 m of slab and sub-base stays in the ground, 0.5 m working space) digs 37.8 m³, backfills only 18.6 m³ and sends about 20.4 m³ loose away, which is 3 loads.
Notes for Dubai and the UAE
- The foundation depth, width and type come from the structural drawings and the soil investigation report (geotechnical report) that the building permit relies on. This tool only turns your dimensions into volumes.
- In many parts of Dubai the groundwater table can be shallow, and the ground can be loose sand, cemented sand or soft rock. Deep pits may need dewatering, shoring or rock breaking, which this calculator does not include. Follow the consultant's instructions.
- Digging deeper than about 1.5 m needs a designed and approved method (sloping or shoring) and safe access. Dubai Municipality and the project's safety rules apply. Check with your contractor and consultant what is required for your plot.
- Find the underground services (DEWA cables and pipes, telecom, drainage, irrigation) and any neighbouring structures before you dig, and keep the working space clear of them.
- Surplus soil and construction waste normally has to go to an approved disposal or reuse site, and backfill is normally clean approved fill compacted in layers to the specification (a compaction test is usually required). Ask your contractor and the authority what applies. Site soil that is salty, organic or contains large stones is often rejected as backfill: untick the reuse option in that case.
This tool counts soil and trucks only. For the cost of the whole annex, use the calculator in our app.
Frequently asked questions
How do I calculate excavation volume for footings?
Take the footing size, add the working space on every side, multiply by the depth, and add the extra volume of the sloped sides if the pit is not vertical. The calculator does this for any number of pits, trenches and area digs at once, and gives the result in cubic metres in place and loose.
How many truck loads of soil do I need to remove?
Loads = surplus soil in loose measure ÷ the truck size. The surplus is the soil dug minus the soil needed for the backfill, so it is usually much smaller than the total dug. If the dug soil cannot be reused, untick the reuse option and all of it is counted.
What is the swell (bulking) factor of soil?
It is the extra volume the soil takes after it is dug. As a rough planning guide, sand swells about 12 percent, common soil about 20 to 30, clay 30 to 40 and broken rock 40 to 60 percent. Your soil report or hauler may give better figures, and you can enter your own.
Why is the backfill smaller than the volume I dug?
Because the footings, necks and walls now fill part of the hole. Backfill is the dug volume minus the structure left in the ground, then compacted in layers.
How much working space should I leave around a footing?
Usually 0.3 to 0.6 m on each side, enough to fix the formwork and apply waterproofing. Use 0 if the footing is cast directly against the soil. The consultant's specification decides.
Does the calculator include rock breaking, dewatering or shoring?
No. It counts soil volumes and truck loads only. Those items depend on the ground and the groundwater and are set by your consultant and contractor. The approved drawings and your engineer always govern the final quantities.