Concrete Mix Ratio Calculator (Cement, Sand, Aggregate)

Use this concrete mix ratio calculator to turn a volume of concrete into bags of cement, sand, coarse aggregate and water. Pick a nominal mix such as 1:2:4 for site mixing, or start from the cement content and water-cement ratio, which is the first step of concrete mix design. It gives quantities only, in metric units, for Dubai and the UAE.

How the mix quantities are calculated

Nominal mix by volume (for example 1:2:4 means 1 part cement, 2 parts sand and 4 parts coarse aggregate):

  • Wet volume = concrete volume × (1 + waste allowance).
  • Dry volume of materials = wet volume × the dry volume factor (1.54 by default). The factor covers the voids that fill when the materials are mixed and compacted; 1.52 to 1.57 is usual.
  • Each material gets its share of the dry volume: cement = dry volume × 1 ÷ (1 + sand + aggregate), sand and aggregate in the same way.
  • Cement mass = its volume × 1440 kg/m³ (typical bulk density of cement), so one 50 kg bag is about 0.035 m³. Sand and aggregate masses use the bulk densities you set (1600 and 1500 kg/m³ are typical for loose material).
  • Water = cement mass × the water-cement ratio (0.5 by default), in litres.

From cement content and water-cement ratio (absolute volume method):

  • Water per m³ = cement content × water-cement ratio.
  • Aggregate volume per m³ = 1 m³ − cement volume (cement mass ÷ 3150) − water − air.
  • Aggregate mass = that volume × the particle density (2650 kg/m³ by default, saturated surface dry), split into sand and coarse aggregate by the sand share.

This second method is a trial-mix starting point, not a finished concrete mix design. A real design mix is proved with trial batches and laboratory tests for strength, workability and durability.

Worked example

5 m³ of concrete with a 1:2:4 mix and 5 percent waste.

  • Wet volume: 5 × 1.05 = 5.25 m³
  • Dry volume: 5.25 × 1.54 = 8.085 m³, shared in 7 parts (1 + 2 + 4)
  • Cement: 8.085 ÷ 7 = 1.155 m³ × 1440 = 1,663 kg, which is 33.3 bags, so 34 bags of 50 kg
  • Sand: 2 × 1.155 = 2.31 m³ (3.70 tonnes at 1600 kg/m³)
  • Coarse aggregate: 4 × 1.155 = 4.62 m³ (6.93 tonnes at 1500 kg/m³)
  • Water: 1,663 × 0.5 = 832 litres

With the second method (cement 380 kg/m³, water-cement ratio 0.45, 40 percent sand, 2 percent air, particle density 2650): water 171 L, aggregate volume 1 − 0.02 − 0.1206 − 0.171 = 0.688 m³ = 1,824 kg (730 kg sand, 1,095 kg coarse) per m³. For 5.25 m³ that is 1,995 kg of cement (40 bags), 898 L of water, 2.39 m³ of loose sand and 3.83 m³ of loose coarse aggregate.

Notes for Dubai and the UAE

  • Structural concrete (foundations, columns, beams, slabs) is normally ordered as ready-mix by grade from a supplier with an approved mix design. Nominal site mixes do not reach structural grades such as C32/40, which are ordered as ready-mix. Site-mixed nominal ratios suit blinding, non-structural work, small repairs and plinths. Ask your engineer before site-mixing anything structural.
  • Cement bags in the UAE are normally 50 kg. The engineer often specifies the cement type; sulphate-resisting cement is commonly required for foundations in salty ground, so follow the specification.
  • Use washed or crushed sand and clean aggregate that meet the specification. Fine rounded desert sand is generally not suitable for structural concrete, and sea water or brackish groundwater must not be used for mixing. Ask your consultant what they accept.
  • Hot-weather concreting rules apply in the summer months. Water, aggregate temperature and the time to place the concrete all matter, and the engineer sets the limits.
  • Dubai Municipality inspections and the consultant usually require cube or cylinder samples during the pour.

This tool measures materials only. For the cost of the whole annex, use the calculator in our app.

Frequently asked questions

What is the concrete mix ratio 1:2:4?

It means 1 part cement, 2 parts sand and 4 parts coarse aggregate by volume. It is a traditional nominal mix of about 15 N/mm² used for non-structural work. A 1:1.5:3 mix is stronger (about 20 N/mm²) and 1:3:6 is a lean mix for blinding.

How many bags of cement are needed for 1 m³ of concrete?

A 1:2:4 mix needs about 6.3 bags of 50 kg per m³ of concrete and a 1:1.5:3 mix about 8 bags, with the default dry volume factor of 1.54. The calculator shows the bags per m³ and the total for your volume, rounded up.

What is the dry volume factor?

The materials take up more volume dry and loose than the compacted concrete they make, because the sand fills the gaps between the aggregate and the cement fills the gaps between the sand. The factor is about 1.54, so you need 1.54 m³ of dry materials for each m³ of wet concrete.

How is concrete mix design different from a nominal mix?

A nominal mix uses fixed proportions. A mix design chooses the cement content, water-cement ratio and aggregate grading to reach a target strength and durability, and proves it with trial mixes. Use the second method of the calculator for a starting point and let the laboratory or the ready-mix supplier confirm it.

Does it show prices?

No. The tools on this page give quantities only. To price an annex, use the cost calculator in our app.

Is the result exact?

It is a planning estimate. Moisture in the sand, the grading of the aggregate and the cement type change real mixes, and the approved mix design and your engineer always govern.