This room tile and paint calculator turns the size of one room into a shopping list. Enter the room length, width and height and the doors and windows, and it gives the floor tiles and boxes (with skirting cut from the same tiles), the tile adhesive and grout, the litres of primer and paint for the walls and ceiling, and, if you want a false ceiling, the gypsum boards, profiles and hangers. Everything comes out as order quantities with waste included. It gives quantities only, in metric units, for majlis, bedroom and annex room finishing in Dubai and the UAE.

How the room finishing calculator works

All the factors below are typical values, not standards: the product data sheets, the project specification and the approved drawings govern.

  • Areas: floor = length × width; perimeter = 2 × (length + width); walls = perimeter × height − doors − windows; ceiling = floor area.
  • Floor tiles = floor area ÷ ((tile length + joint) × (tile width + joint)) × (1 + waste), rounded up. Default waste 10 percent (5 to 10 percent for straight laying, 10 to 15 for diagonal or large format). Boxes = tiles ÷ tiles per box, rounded up.
  • Skirting is cut from the same tiles. Length = perimeter − door widths. Each tile gives floor(short side ÷ (skirting height + 3 mm saw cut)) strips along its long side; pieces = length ÷ long side × (1 + waste), tiles for skirting = pieces ÷ strips per tile. They are added to the floor tiles.
  • Adhesive = floor area × (notch size ÷ 2) kg/m² × 1.10, in 25 kg bags (a 10 mm notch is about 5 kg/m², 12 mm about 6 kg/m²). Grout = floor area × (L + W) ÷ (L × W) × tile thickness × joint × 1.6 kg per litre × 1.10.
  • Paint = (net wall area + ceiling if painted) × coats ÷ spreading rate × (1 + waste). Defaults: 2 coats at 10 m² per litre per coat, 10 percent waste. Primer = same area ÷ 10 m² per litre × (1 + waste).
  • Gypsum ceiling: boards = ceiling area ÷ board area × 1.10, rounded up (1200 × 2400 mm is 2.88 m²). Profiles: main channels at 1.2 m spacing (area ÷ 1.2 m), furring channels at 400 mm (or 600 mm) spacing, wall angle along the perimeter, each plus 5 percent for laps and cuts, counted in pieces of 3.0 or 3.6 m. Hangers about every 1.2 m along the main channels.

Sources and limits: the 1.2 m spacing for main channels and hangers is within the common maximum of about 1.2 m (4 ft) for suspended gypsum ceilings in gypsum-board handbooks and ASTM C754. Furring channels are limited to about 600 mm for 12.5 mm board, and 400 mm is the usual tighter spacing (for example for fire-rated ceilings). This is a common layout, not a single standard: the board and profile supplier's system sheet governs. Screws, tape, jointing compound, access panels, light cut-outs, door frames, trim and plaster repairs are not included. For wall tiling or several floors at once use the tile calculator.

Worked example: an 8 × 6 m majlis

A majlis 8 m by 6 m and 3.2 m high with two doors 1.0 × 2.1 m and three windows 1.5 × 1.5 m. 800 × 800 mm tiles with a 3 mm joint, 10 mm thick, 3 tiles per box, 12 mm notched trowel, 10 percent waste, 100 mm skirting cut from the same tiles. Two coats of paint on walls and ceiling at 10 m² per litre plus primer, 10 percent waste. A gypsum board ceiling over the whole room with 1200 × 2400 mm boards, furring at 400 mm and 3 m profiles. These are the calculator's default numbers.

  • Floor 48.00 m². Perimeter 28 m. Walls 28 × 3.2 = 89.60 m², less doors 4.20 and windows 6.75 = 78.65 m². Ceiling 48.00 m².
  • Floor tiles: pitch 0.803 × 0.803 = 0.6448 m², 48 ÷ 0.6448 = 74.4, × 1.1 = 81.9, so 82 tiles.
  • Skirting: 28 − 2 × 1.0 = 26.0 m. Strips per tile floor(800 ÷ 103) = 7. Pieces 26 ÷ 0.8 × 1.1 = 35.75, so 36 pieces, which is 6 tiles. Total 88 tiles, 30 boxes of 3.
  • Adhesive: 48 × 6 × 1.1 = 316.8 kg, so 13 bags of 25 kg. Grout: 0.12 kg/m² × 48 × 1.1 = 6.3 kg.
  • Paint: area 78.65 + 48 = 126.65 m². 126.65 × 2 ÷ 10 × 1.1 = 27.9 litres. Primer 126.65 ÷ 10 × 1.1 = 13.9 litres.
  • Gypsum boards: 48 ÷ 2.88 × 1.1 = 18.3, so 19 boards. Main channels 48 ÷ 1.2 × 1.05 = 42.0 m, 14 pieces. Furring 48 ÷ 0.4 × 1.05 = 126.0 m, 42 pieces. Wall angle 28 × 1.05 = 29.4 m, 10 pieces. That is 66 profile pieces of 3 m and about 34 hangers.

Other quick examples to try with the buttons above the calculator: a 4 × 4 m annex bedroom with 600 × 600 mm tiles (4 per box) needs about 55 tiles in 14 boxes, 4 bags of adhesive, 13.3 litres of paint and 7 gypsum boards. A 3 × 3 m maid room without a false ceiling needs about 33 tiles in 9 boxes, 2 bags of adhesive and 9.3 litres of paint.

Notes for Dubai and the UAE

  • Floor tiles are normally 600 × 600 or 800 × 800 mm porcelain, with a box label giving the number of tiles and the area covered. Order all the tiles of a room from the same batch (shade and calibre) and keep a few spare tiles for repairs.
  • Tile type, adhesive class, grout, paint system, board thickness and the false ceiling layout are set in the approved drawings, the specification and the finishes schedule. Wet areas and fire-rated ceilings have their own requirements from the consultant and the authorities.
  • Gypsum false ceilings in villas carry lights, air-conditioning diffusers and access panels. Those openings and the extra framing around them are not in this count: ask your ceiling subcontractor for the final take-off.
  • Surfaces should be dry and cured before tiling and painting. In summer, new plaster and screeds dry quickly on the surface but not inside, so follow the consultant and the product data sheets.

This tool counts materials only. For the cost of the whole annex or villa, use the calculator in our app.

Frequently asked questions

How do I calculate how many floor tiles I need for a room?

Multiply the room length by its width to get the floor area, divide by the area of one tile including its joint, and add 5 to 15 percent for cuts and breakage. Then divide by the tiles in a box and round up. If you also want skirting from the same tiles the calculator adds the extra tiles for it.

How much paint do I need for a room?

Take the wall area (perimeter × height, less doors and windows), add the ceiling if you paint it, multiply by the number of coats and divide by the spreading rate on the tin, usually 8 to 14 m² per litre per coat. Add 10 percent and a coat of primer on new surfaces. The 8 × 6 m majlis above needs about 28 litres of paint and 14 litres of primer.

How many gypsum boards do I need for a false ceiling?

Divide the ceiling area by the area of one board (2.88 m² for 1200 × 2400 mm) and add 10 percent for cuts. A 48 m² ceiling needs 19 boards, plus about 66 profile pieces of 3 m and 34 hangers in the common layout used here.

Does it include wall tiles in bathrooms and kitchens?

No, this tool covers the floor, the wall paint and the ceiling of a room. For tiled walls use the tile calculator, which takes wall rows with their openings.

What is not included in the gypsum ceiling quantities?

Screws, joint tape and compound, access panels, light and diffuser cut-outs, bulkheads and cornices. Ask your ceiling subcontractor for the final list.

Is the result exact?

It is a planning estimate based on the sizes and typical factors shown. The approved drawings, the specification and the product data sheets always govern the final quantities.