Tile Calculator: Tiles, Boxes, Adhesive and Grout

This tile calculator works out how many floor and wall tiles you need, how many boxes to buy, and how much tile adhesive and grout to order. Enter the rooms and tiled walls, the tile size, the joint width and the waste allowance. It also counts skirting cut from the same tiles. It gives quantities only, in metric units, for villa and annex work in Dubai and the UAE.

How the tile calculator works

  • Floor area: length × width. Wall tiling: length × height minus the openings. You can also type an area directly.
  • Number of tiles: net area ÷ ((tile length + joint) × (tile width + joint)), then × (1 + waste ÷ 100), rounded up. The joint is added to each tile so the count matches a real layout.
  • Boxes: tiles (including skirting tiles) ÷ tiles per box, rounded up.
  • Skirting: the floor perimeter minus the door openings. Each skirting piece is as long as the tile, and each tile gives whole strips of the skirting height (for example five strips of 100 mm from a 600 mm tile, because a 3 mm saw cut is allowed for each strip). Waste is added to the pieces.
  • Tile adhesive: net area × consumption × 1.10. The consumption depends on the notched trowel: typically 3, 4, 5 and 6 kg/m² for 6, 8, 10 and 12 mm. Large-format tiles (a side over 300 to 400 mm) are normally back-buttered as well, which can add a third to a half more adhesive, so choose the 12 mm option for them. The result is shown in 25 kg bags, rounded up.
  • Grout: net area × (L + W) ÷ (L × W) × tile thickness × joint width × 1.6 × 1.10, with all sizes in millimetres. The 1.6 is a typical density of grout in kg per litre.

The adhesive and grout figures are typical values with a 10 percent allowance for spillage, uneven backgrounds and wasted joint filler. The data sheet of the product you buy always governs. All the tiles in one calculation share the same size: for floor and wall tiles of different sizes, run the calculator twice.

Worked example

Two floors of 5 × 4 m and 3 × 2.5 m, and a bathroom wall of 11 m by 2.4 m with 1.89 m² of openings, all in 600 × 600 × 10 mm tiles with 3 mm joints, 10 percent waste and 4 tiles per box. Skirting 100 mm high with two doors of 0.9 m. Adhesive with a 10 mm trowel.

  • Net area: 20 + 7.5 + (26.4 − 1.89) = 52.01 m²
  • One tile with its joint: 0.603 × 0.603 = 0.3636 m², so 52.01 ÷ 0.3636 = 143.04 tiles
  • With 10 percent waste: 143.04 × 1.10 = 157.3, so 158 tiles
  • Skirting: floor perimeter 18 + 11 = 29 m, less 2 × 0.9 = 27.2 m. Pieces: 27.2 ÷ 0.6 × 1.10 = 49.9, so 50 pieces, 5 per tile (600 ÷ 103 = 5.8, rounded down), so 10 tiles
  • Total tiles: 158 + 10 = 168, which is 42 boxes of 4
  • Adhesive: 52.01 × 5 × 1.10 = 286 kg, which is 12 bags of 25 kg
  • Grout: (600 + 600) ÷ (600 × 600) × 10 × 3 × 1.6 = 0.16 kg/m², so 52.01 × 0.16 × 1.10 = 9.2 kg

Notes for Dubai and the UAE

  • Buy all the tiles for one area from the same batch. Shade and size can differ slightly between production batches, so order the full quantity, including the waste, at once.
  • Wet areas such as bathrooms, kitchens and balconies normally need a waterproofing system under the tiles, and the specification or consultant sets the details. This calculator does not count waterproofing.
  • Large-format porcelain and outdoor tiles in strong sun and heat usually need movement joints and a suitable adhesive. Follow the tile and adhesive manufacturers and the approved specification.
  • Floor tile finishes, sizes and the pattern are normally defined in the approved finishing schedule. Check it before ordering.
  • Tile boxes differ between brands. Four 600 × 600 mm tiles per box (1.44 m²) is common, but read the label of your tile.

This tool measures tile quantities only. For the cost of the whole annex, use the calculator in our app.

Frequently asked questions

How do I calculate how many tiles I need?

Divide the area by the area of one tile including its joint, then add 5 to 10 percent for cuts and breakage and round up. For 20 m² of 600 × 600 mm tiles with 3 mm joints, that is 20 ÷ 0.3636 = 55 tiles before waste.

How much waste should I add for tiles?

About 5 to 10 percent for straight laying in simple rooms, and 10 to 15 percent for diagonal, large-format or patterned layouts and rooms with many corners. The calculator uses 10 percent by default.

How much tile adhesive do I need per square metre?

It depends on the tile size and the notched trowel. Typical figures are about 3 kg/m² for a 6 mm trowel and 5 kg/m² for a 10 mm trowel used for 600 mm floor tiles. Check the data sheet of your adhesive.

How much grout do I need?

Grout depends on the tile size, the tile thickness and the joint width. For 600 × 600 × 10 mm tiles with 3 mm joints it is about 0.16 kg/m². Narrow joints and big tiles use very little, small tiles and wide joints use much more.

Does the calculator include skirting?

Yes, if you leave the skirting option on. It cuts the skirting from the same tiles, deducts the door openings and tells you how many extra tiles to order.

Is the result exact?

It is a planning estimate based on the sizes you enter. The layout, the cuts and the products you choose change the real use. The approved drawings and your engineer or consultant govern the final quantities.