Use this paint calculator to find how many litres of paint and primer a villa, annex or majlis needs. Enter the rooms, walls or ceilings, take off the doors and windows, choose the number of coats and the spreading rate of your paint, and see the litres and the number of tins. It gives quantities only, in metric units, for work in Dubai and the UAE.
How the paint calculator works
The calculator works out the area to paint first, then the litres.
- Room walls: 2 × (length + width) × ceiling height.
- Single wall: length × height. Use it for external walls and boundary walls.
- Ceiling: length × width.
- Net wall area: wall area minus the doors and windows (number × area of one opening).
- Litres of paint: area × number of coats ÷ spreading rate (m² per litre per coat) × (1 + waste ÷ 100).
- Litres of primer: (net wall area + ceiling area) ÷ primer spreading rate × (1 + waste ÷ 100), one coat.
- Tins: litres ÷ tin size, rounded up, for wall paint, ceiling paint and primer separately.
The default spreading rate of 10 m² per litre per coat is a typical value for interior emulsion on smooth plaster. Data sheets of interior paints usually quote a range of roughly 8 to 14 m² per litre, and rough, textured or very absorbent surfaces take more paint. Always use the figure on the data sheet of the paint you buy.
Worked example
A small annex has one room of 5 × 4 m and two rooms of 4 × 3 m, all with a 3 m ceiling, three doors of 1.89 m² and three windows of 1.8 m². Two coats of paint, one coat of primer, 10 percent waste, 18 litre tins.
- Walls: 2 × (5 + 4) × 3 = 54 m², plus 2 × [2 × (4 + 3) × 3] = 84 m², total 138 m²
- Ceilings: 5 × 4 = 20 m², plus 2 × (4 × 3) = 24 m², total 44 m²
- Openings: 3 × 1.89 + 3 × 1.8 = 11.07 m², so net walls = 126.93 m²
- Wall paint: 126.93 × 2 ÷ 10 × 1.10 = 27.9 litres, so 2 tins of 18 L
- Ceiling paint: 44 × 2 ÷ 10 × 1.10 = 9.7 litres, so 1 tin
- Primer: (126.93 + 44) ÷ 10 × 1.10 = 18.8 litres, so 2 tins
Notes for Dubai and the UAE
- New plaster and block walls normally need a sealer or primer before the finish coats, and the plaster should be fully dry first. In the Dubai climate external walls are usually painted with an exterior-grade paint that suits heat and strong sun, so use the spreading rate of that product.
- Villa and annex finishes are set in the approved specification and the finishing schedule. Where the colour or product is named there, follow it.
- Tin sizes differ between brands. 4 litre and 18 litre tins are common, but check what your supplier sells and ask if sizes can be mixed to reduce leftovers.
- Textured and decorative finishes use much more material than a flat emulsion. Ask the manufacturer for the coverage of that finish.
- Check the building owner or community rules on exterior colours before you order paint for a villa facade.
This tool measures paint quantities only. For the cost of the whole annex, use the calculator in our app.
Frequently asked questions
How do I calculate how much paint I need?
Work out the wall and ceiling area, subtract the doors and windows, multiply by the number of coats and divide by the spreading rate in m² per litre. Then add a little for waste. This calculator does all the steps for you.
How much area does one litre of paint cover?
A typical interior emulsion covers about 8 to 14 m² per litre per coat on smooth plaster. The exact figure is on the paint tin or data sheet. Rough or textured walls cover less.
How many coats of paint do I need?
Two finish coats over a primer or sealer is the usual standard for walls. A light colour over a dark one, or a repaint after a big colour change, may need more. The calculator lets you choose from one to five.
Do I need primer?
New plaster, new block walls and patched areas normally need a primer or sealer so the finish coats cover evenly. The calculator adds one coat of primer by default and you can switch it off for repainting sound walls.
Does the calculator include doors, skirting and trim?
No. It deducts the door and window openings from the walls but does not include frames, skirting, cornices or doors themselves, which use different paints.
Is the result exact?
It is a planning estimate. The paint you choose, the surface and how it is applied change the real use. The approved drawings and your engineer or consultant govern the final quantities.