Use this area calculator to find the area of a plot, a room or a whole building in square metres and square feet, and to see how much of the plot your building covers. Add rectangles, L-shapes, triangles, trapezoids, circles, a plot given by its four title-deed sides and a diagonal, or any outline by the coordinates of its corners (up to six). Deduct a courtyard or void, multiply by the number of floors, and get the built-up area and the coverage percentage. It gives areas only, in metric units, for villa, annex and majlis work in Dubai and the UAE.
How the area calculator works
Each shape gives an area in m². The plot shapes are added together, and so are the building shapes for one floor. A deduct shape (courtyard, void, shaft) is subtracted from its group.
- Rectangle = length × width.
- L-shape = overall length × overall width − cut-out length × cut-out width (the cut-out is a corner, so it must be smaller than the overall size).
- Triangle = base × height ÷ 2. Trapezoid = (side A + side B) ÷ 2 × the distance between the two parallel sides.
- Circle = π × diameter² ÷ 4.
- Four sides and one diagonal (the way many plots are described in the title deed): the diagonal AC splits the plot into triangles ABC and ACD. Each is found with Heron's formula: s = (a + b + c) ÷ 2 and area = √(s × (s − a) × (s − b) × (s − c)). The two areas are added. Choose the diagonal that runs inside the plot: if the plot is concave (bent inward) at A or C, that diagonal falls outside and the area is overstated, so use the corner coordinates option instead. If the lengths cannot form a triangle the shape is counted as zero and a warning is shown.
- Corner coordinates use the shoelace formula: area = |Σ (xi × yi+1 − xi+1 × yi)| ÷ 2, with the corners listed in order around the shape. Measure the coordinates from any common starting point.
- Built-up area = one-floor area × number of floors + any extra area you add.
- Coverage = one-floor area ÷ plot area × 100. Plot ratio = built-up area ÷ plot area × 100.
- Units: 1 ft = 0.3048 m exactly, so 1 m² = 1 ÷ 0.3048² = 10.7639 ft² and 1 ft² = 0.092903 m².
Worked example
A villa plot of 25 × 30 m with a ground floor made of a main block of 18 × 14 m and a majlis wing of 6 × 5 m, built on two floors.
- Plot: 25 × 30 = 750 m², which is 750 × 10.7639 = 8,072.9 ft².
- One floor: 18 × 14 = 252 m² and 6 × 5 = 30 m², total 282 m² (3,035.4 ft²).
- Coverage: 282 ÷ 750 = 37.6 percent of the plot.
- Built-up area: 282 × 2 floors = 564 m² (6,070.8 ft²), which is 75.2 percent of the plot.
Two more examples are one tap away. A majlis room of 6 × 8 m is 48 m² (516.7 ft²). An irregular plot with sides AB 30, BC 20, CD 25, DA 22 m and diagonal AC 35 m is 299.41 m² (triangle ABC, s = 42.5) plus 273.47 m² (triangle ACD, s = 41), a total of 572.88 m².
Notes for Dubai and the UAE
- The official plot area is the one on the title deed and the plot plan from the authority or master developer. Use this calculator to check your own measurements against it, not to replace it. Many deeds show the area in square feet and square metres, so the converter above is handy.
- The permitted coverage, number of floors and built-up area for a plot are set by the authority (for example Dubai Municipality) and the master developer rules for that community. They differ from plot to plot, so check them before you design. This tool does not state those limits.
- What counts as built-up area (balconies, covered parking, roof rooms, basements) follows the authority's own definition. The number here is a simple sum, good for planning and for checking quantities.
- Areas drive many quantities: floor tiles, plaster, paint and concrete slabs. Once you have the area, use the tile calculator, plaster calculator or paint calculator.
This tool measures areas only. For the cost of the whole project, use the calculator in our app.
Frequently asked questions
How do I calculate the area of a plot?
For a rectangle multiply length by width. For an irregular plot give the four sides and one diagonal from the title deed, or the coordinates of the corners, and the calculator splits or sums the shape for you.
How do I convert square metres to square feet?
Multiply by 10.7639. For example 750 m² is 8,072.9 ft². To go the other way divide by 10.7639, or multiply square feet by 0.092903. The converter in the calculator does both.
What is the coverage percentage of a plot?
It is the area of the building on one floor (the footprint) divided by the plot area. A 282 m² footprint on a 750 m² plot is 37.6 percent. The maximum allowed for your plot comes from the authority and the master developer.
How do I find the area of an L-shaped room or plot?
Take the overall length times the overall width and subtract the corner that is missing. You can also add two rectangles. Both give the same area.
Can I calculate the area of a plot from its corner coordinates?
Yes. Choose the corner coordinates option with 4, 5 or 6 corners and enter each corner in order around the plot. The calculator uses the shoelace formula.
Is the built-up area the same as the official figure?
Not necessarily. The authority has its own rules for what is counted, so use its definition for permits. The figure here is a planning sum of the floors you enter.