Arch. Eng. Ibrahim
Architect engineer, design and licensing
Ibrahim is an architect engineer at Al Mustafa Contracting. He designs villa annexes, majlis and rest houses, and prepares the architectural drawings and 3D views that owners review and approve before building. He writes about architectural design and design ideas for annexes and majlis.